A.O. Smith
BTN 120 THRU 400/A Series One Or Two Temperature - One Heaters,High Temperature
Install
Heater Wiring
Warranty
Dimension
Maintenance
System Diagnostics
Recommended Procedure For
Checklist
Replacement Parts
Precautions
Page 16
Page 15
Page 17
Image 16
Page 15
Page 17
Contents
MODELS BTN 120 THRU 400/A Series
INSTALLATION OPERATION MAINTENANCE LIMITED WARRANTY
COMMERCIAL GAS, GLASS-LINED, TANK-TYPE WATER HEATER
ROUGH-IN-DIMENSIONS
TABLE 1. ROUGH-IN-DIMENSIONS
TABLE 3. GASAND ELECTRICAL CHARACTERISTICS
FRONT VIEW
TABLE OF CONTENTS
FOREWORD
GENERAL SAFETY INFORMATION
PRECAUTIONS
GROUNDING INSTRUCTIONS
CHEMICAL VAPOR CORROSION
FEATURES
HIGH ALTITUDE INSTALLATIONS
HIGH LIMIT SWITCH
ELECTRONIC IGNITION CONTROL
CIRCULATING PUMP
DISHWASHING MACHINE REQUIREMENT
UNCRATING
LOCATING THE HEATER
LEVELING
CLEARANCES
HARD WATER
AIR REQUIREMENTS
VENTING
MULTIPLE HEATER MANIFOLD
UNCONFINED SPACE
CONFINED SPACE
TABLE 6. TECHNICAL DATA VENTING
TYPE B GAS VENT Multiple Gas Fired Tank-Type Heaters
TABLE 6. TECHNICAL DATA VENTING Continued
WATER LINE CONNECTIONS
WATER POTABLE HEATING AND SPACE HEATING See pages
THERMOMETERS Not Supplied
RELIEF VALVE
INSTALLATION DIAGRAMS-TOP INLET/OUTLET USAGE
GENERAL
CODE RESTRICTIONS
DANGER
VERTICAL STORAGE TANK AND FORCED CIRCULATION
HORIZONTAL STORAGE TANK AND FORCED CIRCULATION
TEMPERATURE SETTING SHOULD NOT EXCEED SAFE USE
TEMPERATURE AT FIXTURES. SEE WATER TEMPERATURE CONTROL
TWO TEMPERATURE - ONE HEATER HIGH TEMPERATURE STORAGE
WITH RECIRCULATION OF SANITIZING LOOP
TWO TEMPERATURE - TWO HEATERS, ONE PRE-HEATER/ONE - BOOSTER HEATER
INSTALLATION DIAGRAMS-SIDE INLET/OUTLET USAGE
WITH OR WITHOUT BUILDING RECIRCULATION
ONE OR TWO TEMPERATURE - ONE HEATERS,HIGH TEMPERATURE
STORAGE WITH OR WITHOUT RECIRCULATION
HEATER WITH OR WITHOUT MIXING VALVE
HEATER WITH MIXING VALVE AND RECIRCULATED SANITIZING LOOP
TWO TEMPERATURE - TWO PRE-HEATERS WITH MIXING VALVE OR BOOSTER
HEATER WITH OR WITHOUT BUILING RECIRCULATION
TWO PRE-HEATERS WITH MIXING VALVE
TWO PRE-HEATERS WITH BOOSTER HEATER
MEDIUM TEMPERATURE - ONE HEATER WITH AUXILIARY STORAGE TANK FORCED
CIRCULATION WITH OR WITHOUT BUILDING RECIRCULATION
VERTICAL STORAGE TANK
HORIZONTAL STORAGE TANK
MANIFOLD KITS
TWO UNIT MANIFOLD KIT
THREE UNIT MANIFOLD KIT
FOUR UNIT MANIFOLD KIT
HEATER WIRING
FIGURE 9 - SINGLE UNIT WIRING DIAGRAM BTN-120 THROUGH 400A
GAS PIPING
GAS PRESSURE REGULATOR
TABLE 7 - GAS SUPPLY LINE SIZES IN INCHES MAXIMUM CAPACITY OF PIPE IN
CUBIC FEET PER HOUR
OPERATION
MANIFOLD GAS PRESSURE IN INCHES OF WATER COLUMN ALL MODELS
APPROXIMATE TIME REQUIRED TO CONSUME
1 CU. FT. OF GAS AT FULL CAPACITY
SEQUENCE OF OPERATION
LIGHTING AND OPERATION INSTRUCTIONS
FOR YOUR SAFETY READ BEFORE OPERATING
OPERATING INSTRUCTIONS
PREVENTIVE MAINTENANCE
CHECK THE IGNITOR ASSEMBLY
IGNITOR ASSEMBLY
WATER TEMPERATURE CONTROL
MAIN BURNER
GAS VALVES
CHECKING THE INPUT
FIGURE 11, IGNITOR
VENTING SYSTEM
REMOTE STORAGE TANK TEMPERATURE CONTROL
HOT WATER ODOR
ANODE ROD INSPECTION
RECOMMENDED PROCEDURE FOR
TANK CLEANOUT PROCEDURE
DELIMING SOLVENTS
DELIMING USING FLO-JUG METHOD
SERVICE
SYSTEM DIAGNOSTICS
IGNITION MODULE SYSTEM
ELECTRICAL SERVICING
SEQUENCE OF OPERATION FLOW CHART
REPLACEMENT PARTS, SERVICE HANDBOOKS AND TRAINING AIDS
REPLACEMENT PARTS
OPERATIONAL CHECKLIST
SERVICEMAN
REMEDY
COMPLAINT
Model BTN Limited Warranty
4. SERVICEANDREPAIREXPENSES
6. CLAIMPROCEDURE
KEEPTHISWARRANTYPOSTEDADJACENTTOTHEHEATERFORFUTUREREFERENCE
Related pages
Service Troubleshooting Tips Care for GE JR JGSP22
Specifications for Cisco Systems SG100D08PNA
Appendix 2.2.1 Meanings of the indicator lights for Q-See QSDT8PCRC
Wiring Schematic for Windsor CMPSR 10070080
How to Use the Hand Mixer for KitchenAid KHM7T
Monitori draiveri installimine käsitsi for Samsung LS19CMYKFNA/EN
Isolator Parts List for Greenheck Fan BDF
Area Code List for LG Electronics BP120
HR2527A Electric Horsepower Requirements for Giant HR3030
Keyboard Settings for Samsung LH65DMEXTBC/EN
What tools do I need as per the
Samsung HW-K650 manual
?
Top
Page
Image
Contents