INSTALLATION DIAGRAMS-SIDE INLET/OUTLET USAGE

INSTALLATION DIAGRAMS-SIDE INLET/OUTLET USAGE

A listed temperature and pressure relief valve of adequate capacity is installed on the heater. The locations shown in the installation diagrams on the following pages are typical.

The discharge opening of the temperature and pressure relief valve must be piped to an open drain and should not be subject to freezing conditions. DO NOT REDUCE, BLOCK OR PLUG THE DISCHARGE OPENING OF THE VALVE.

TWO TEMPERATURE - TWO HEATERS, ONE PRE-HEATER/ONE - BOOSTER HEATER

WITH OR WITHOUT BUILDING RECIRCULATION

TWO TEMPERATURE - TWO HEATERS, ONE PRE-HEATER/ONE - BOOSTER HEATER DANGER

TEMPERATURE SETTING SHOULD NOT EXCEED SAFE USE

TEMPERATURE AT FIXTURES. SEE WATER TEMPERATURE CONTROL

WARNING ON PAGE 25. IF HIGHER PREHEAT TEMPERATURES ARE

NECESSARY TO OBTAIN ADEQUATE BOOSTER OUTPUT,ADD ANANTI-

SCALD VALVE FOR HOT WATER SUPPLIED TO FIXTURES.

CIRCULATING RETURN LINE CONNECTION

-FROM FIXTURE LOOP, IF USED, CONNECT TO PRE-HEATER INLET.

-FROM BOOSTED TEMPERATURE LOOP, IF USED CONNECT TO BOOSTER INLET.

AVAILABLE FROM A.O. SMITH.

*PIPE RELIEF VALVE TO OPEN DRAIN.

INSTALL IN ACCORDANCE WITH LOCAL CODES.

15

Image 15
Contents INSTALLATION OPERATION MAINTENANCE LIMITED WARRANTY MODELS BTN 120 THRU 400/A SeriesCOMMERCIAL GAS, GLASS-LINED, TANK-TYPE WATER HEATER FRONT VIEW ROUGH-IN-DIMENSIONSTABLE 1. ROUGH-IN-DIMENSIONS TABLE 3. GASAND ELECTRICAL CHARACTERISTICSFOREWORD TABLE OF CONTENTSCHEMICAL VAPOR CORROSION GENERAL SAFETY INFORMATIONPRECAUTIONS GROUNDING INSTRUCTIONSELECTRONIC IGNITION CONTROL FEATURESHIGH ALTITUDE INSTALLATIONS HIGH LIMIT SWITCHLOCATING THE HEATER CIRCULATING PUMPDISHWASHING MACHINE REQUIREMENT UNCRATINGAIR REQUIREMENTS LEVELINGCLEARANCES HARD WATERCONFINED SPACE VENTINGMULTIPLE HEATER MANIFOLD UNCONFINED SPACETYPE B GAS VENT Multiple Gas Fired Tank-Type Heaters TABLE 6. TECHNICAL DATA VENTINGTABLE 6. TECHNICAL DATA VENTING Continued RELIEF VALVE WATER LINE CONNECTIONSWATER POTABLE HEATING AND SPACE HEATING See pages THERMOMETERS Not SuppliedDANGER INSTALLATION DIAGRAMS-TOP INLET/OUTLET USAGEGENERAL CODE RESTRICTIONSTEMPERATURE AT FIXTURES. SEE WATER TEMPERATURE CONTROL VERTICAL STORAGE TANK AND FORCED CIRCULATIONHORIZONTAL STORAGE TANK AND FORCED CIRCULATION TEMPERATURE SETTING SHOULD NOT EXCEED SAFE USEWITH RECIRCULATION OF SANITIZING LOOP TWO TEMPERATURE - ONE HEATER HIGH TEMPERATURE STORAGEINSTALLATION DIAGRAMS-SIDE INLET/OUTLET USAGE TWO TEMPERATURE - TWO HEATERS, ONE PRE-HEATER/ONE - BOOSTER HEATERWITH OR WITHOUT BUILDING RECIRCULATION HEATER WITH MIXING VALVE AND RECIRCULATED SANITIZING LOOP ONE OR TWO TEMPERATURE - ONE HEATERS,HIGH TEMPERATURESTORAGE WITH OR WITHOUT RECIRCULATION HEATER WITH OR WITHOUT MIXING VALVETWO PRE-HEATERS WITH BOOSTER HEATER TWO TEMPERATURE - TWO PRE-HEATERS WITH MIXING VALVE OR BOOSTERHEATER WITH OR WITHOUT BUILING RECIRCULATION TWO PRE-HEATERS WITH MIXING VALVEHORIZONTAL STORAGE TANK MEDIUM TEMPERATURE - ONE HEATER WITH AUXILIARY STORAGE TANK FORCEDCIRCULATION WITH OR WITHOUT BUILDING RECIRCULATION VERTICAL STORAGE TANKFOUR UNIT MANIFOLD KIT MANIFOLD KITSTWO UNIT MANIFOLD KIT THREE UNIT MANIFOLD KITFIGURE 9 - SINGLE UNIT WIRING DIAGRAM BTN-120 THROUGH 400A HEATER WIRINGCUBIC FEET PER HOUR GAS PIPINGGAS PRESSURE REGULATOR TABLE 7 - GAS SUPPLY LINE SIZES IN INCHES MAXIMUM CAPACITY OF PIPE IN1 CU. FT. OF GAS AT FULL CAPACITY OPERATIONMANIFOLD GAS PRESSURE IN INCHES OF WATER COLUMN ALL MODELS APPROXIMATE TIME REQUIRED TO CONSUMESEQUENCE OF OPERATION FOR YOUR SAFETY READ BEFORE OPERATING LIGHTING AND OPERATION INSTRUCTIONSOPERATING INSTRUCTIONS WATER TEMPERATURE CONTROL PREVENTIVE MAINTENANCECHECK THE IGNITOR ASSEMBLY IGNITOR ASSEMBLYFIGURE 11, IGNITOR MAIN BURNERGAS VALVES CHECKING THE INPUTANODE ROD INSPECTION VENTING SYSTEMREMOTE STORAGE TANK TEMPERATURE CONTROL HOT WATER ODORDELIMING USING FLO-JUG METHOD RECOMMENDED PROCEDURE FORTANK CLEANOUT PROCEDURE DELIMING SOLVENTSELECTRICAL SERVICING SERVICESYSTEM DIAGNOSTICS IGNITION MODULE SYSTEMREPLACEMENT PARTS, SERVICE HANDBOOKS AND TRAINING AIDS SEQUENCE OF OPERATION FLOW CHARTREPLACEMENT PARTS COMPLAINT OPERATIONAL CHECKLISTSERVICEMAN REMEDYKEEPTHISWARRANTYPOSTEDADJACENTTOTHEHEATERFORFUTUREREFERENCE Model BTN Limited Warranty4. SERVICEANDREPAIREXPENSES 6. CLAIMPROCEDURE