A.O. Smith
BTN 120 THRU 400/A Series Operation, Approximate Time Required To Consume, Filling
Install
Heater Wiring
Warranty
Dimension
Maintenance
System Diagnostics
Recommended Procedure For
Checklist
Replacement Parts
Precautions
Page 22
Page 21
Page 23
Image 22
Page 21
Page 23
Contents
MODELS BTN 120 THRU 400/A Series
INSTALLATION OPERATION MAINTENANCE LIMITED WARRANTY
COMMERCIAL GAS, GLASS-LINED, TANK-TYPE WATER HEATER
TABLE 3. GASAND ELECTRICAL CHARACTERISTICS
ROUGH-IN-DIMENSIONS
TABLE 1. ROUGH-IN-DIMENSIONS
FRONT VIEW
TABLE OF CONTENTS
FOREWORD
GROUNDING INSTRUCTIONS
GENERAL SAFETY INFORMATION
PRECAUTIONS
CHEMICAL VAPOR CORROSION
HIGH LIMIT SWITCH
FEATURES
HIGH ALTITUDE INSTALLATIONS
ELECTRONIC IGNITION CONTROL
UNCRATING
CIRCULATING PUMP
DISHWASHING MACHINE REQUIREMENT
LOCATING THE HEATER
HARD WATER
LEVELING
CLEARANCES
AIR REQUIREMENTS
UNCONFINED SPACE
VENTING
MULTIPLE HEATER MANIFOLD
CONFINED SPACE
TABLE 6. TECHNICAL DATA VENTING
TYPE B GAS VENT Multiple Gas Fired Tank-Type Heaters
TABLE 6. TECHNICAL DATA VENTING Continued
THERMOMETERS Not Supplied
WATER LINE CONNECTIONS
WATER POTABLE HEATING AND SPACE HEATING See pages
RELIEF VALVE
CODE RESTRICTIONS
INSTALLATION DIAGRAMS-TOP INLET/OUTLET USAGE
GENERAL
DANGER
TEMPERATURE SETTING SHOULD NOT EXCEED SAFE USE
VERTICAL STORAGE TANK AND FORCED CIRCULATION
HORIZONTAL STORAGE TANK AND FORCED CIRCULATION
TEMPERATURE AT FIXTURES. SEE WATER TEMPERATURE CONTROL
TWO TEMPERATURE - ONE HEATER HIGH TEMPERATURE STORAGE
WITH RECIRCULATION OF SANITIZING LOOP
TWO TEMPERATURE - TWO HEATERS, ONE PRE-HEATER/ONE - BOOSTER HEATER
INSTALLATION DIAGRAMS-SIDE INLET/OUTLET USAGE
WITH OR WITHOUT BUILDING RECIRCULATION
HEATER WITH OR WITHOUT MIXING VALVE
ONE OR TWO TEMPERATURE - ONE HEATERS,HIGH TEMPERATURE
STORAGE WITH OR WITHOUT RECIRCULATION
HEATER WITH MIXING VALVE AND RECIRCULATED SANITIZING LOOP
TWO PRE-HEATERS WITH MIXING VALVE
TWO TEMPERATURE - TWO PRE-HEATERS WITH MIXING VALVE OR BOOSTER
HEATER WITH OR WITHOUT BUILING RECIRCULATION
TWO PRE-HEATERS WITH BOOSTER HEATER
VERTICAL STORAGE TANK
MEDIUM TEMPERATURE - ONE HEATER WITH AUXILIARY STORAGE TANK FORCED
CIRCULATION WITH OR WITHOUT BUILDING RECIRCULATION
HORIZONTAL STORAGE TANK
THREE UNIT MANIFOLD KIT
MANIFOLD KITS
TWO UNIT MANIFOLD KIT
FOUR UNIT MANIFOLD KIT
HEATER WIRING
FIGURE 9 - SINGLE UNIT WIRING DIAGRAM BTN-120 THROUGH 400A
TABLE 7 - GAS SUPPLY LINE SIZES IN INCHES MAXIMUM CAPACITY OF PIPE IN
GAS PIPING
GAS PRESSURE REGULATOR
CUBIC FEET PER HOUR
APPROXIMATE TIME REQUIRED TO CONSUME
OPERATION
MANIFOLD GAS PRESSURE IN INCHES OF WATER COLUMN ALL MODELS
1 CU. FT. OF GAS AT FULL CAPACITY
SEQUENCE OF OPERATION
LIGHTING AND OPERATION INSTRUCTIONS
FOR YOUR SAFETY READ BEFORE OPERATING
OPERATING INSTRUCTIONS
IGNITOR ASSEMBLY
PREVENTIVE MAINTENANCE
CHECK THE IGNITOR ASSEMBLY
WATER TEMPERATURE CONTROL
CHECKING THE INPUT
MAIN BURNER
GAS VALVES
FIGURE 11, IGNITOR
HOT WATER ODOR
VENTING SYSTEM
REMOTE STORAGE TANK TEMPERATURE CONTROL
ANODE ROD INSPECTION
DELIMING SOLVENTS
RECOMMENDED PROCEDURE FOR
TANK CLEANOUT PROCEDURE
DELIMING USING FLO-JUG METHOD
IGNITION MODULE SYSTEM
SERVICE
SYSTEM DIAGNOSTICS
ELECTRICAL SERVICING
SEQUENCE OF OPERATION FLOW CHART
REPLACEMENT PARTS, SERVICE HANDBOOKS AND TRAINING AIDS
REPLACEMENT PARTS
REMEDY
OPERATIONAL CHECKLIST
SERVICEMAN
COMPLAINT
6. CLAIMPROCEDURE
Model BTN Limited Warranty
4. SERVICEANDREPAIREXPENSES
KEEPTHISWARRANTYPOSTEDADJACENTTOTHEHEATERFORFUTUREREFERENCE
Related pages
How do I contact support for my
Euro Pro Pressure Washer
?
Top
Page
Image
Contents