Bradley Smoker MG-2/BIR3 installation instructions Install bowl assembly, Do not overtighten

Page 9

 

Express® Lavatory System - MG Series with Battery Infrared Control

Installation Instructions

MG-2/BIR3

 

 

Installation Instructions continued . . .

Step 4: Install bowl assembly

IMPORTANT: See Figure 4 below when installing the bowl assembly. If the fixture has soap option, refer to the soap system installation manual 215-1585 before installing the bowl assembly.

1.With someone to assist you, place the bowl assembly squarely onto the frame being careful not to pinch tubing between bowl and frame.

2.Attach the front of the bowl assembly to the frame using the two 1/4-20 x 1/2" pan-head screws and washers provided. Do not tighten screws at this time.

IMPORTANT: When bolting the bowl assembly to the wall, do not overtighten the bolts. Overtightening bolts can damage the Terreon® material.

3.After the bowl assembly is attached to the frame, install the two 3/8" bolts and washers (supplied by the installer) to bolt the bowl to the wall anchors. Do not overtighten bolts.

4.Tighten the screws installed in procedure #2 above to secure the bowl assembly to the frame.

Do not overtighten.

5.If necessary, adjust sprayhead body to fit closely to wall by adjusting sprayhead mounting bolts. See Figure 8 on page 13 for sprayhead mounting bolt locations.

 

 

 

 

 

 

 

 

 

 

3/8" BOLT

 

 

FRAME

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AND WASHER

 

 

 

 

 

 

 

 

 

3/8" BOLT

 

 

SPRAYHEAD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AND WASHER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TERREON®

END CAP (R)

Figure 4

1/4"-20 x 1/2"

PAN HEAD SCREWS AND WASHERS

(2) PLACES

BACK VIEW

BOWL

TERREON® END CAP (L)

Bradley Corporation • 215-1510 Rev. D; ECN 07-815

8/23/07

9

Image 9
Contents Table of Contents Installation InstructionsPre-Installation Information MG-2/BIR3 Express Lavatory System Dimensions Dimensions Rough in supplies and optional hot water heater Installation Instructions23/07 Bradley Corporation 215-1510 Rev. D ECN Rough in wall anchors Mount frame to wall Do not overtighten Install bowl assemblyHot Counterclockwise to increase Connecting electrical and supply tubingTerreon and panel maintenance Cleaning and Maintenance InstructionsStainless Steel Access Panel cleaning Terreon Bowl, Sprayhead and Pedestal End Cap cleaningOther replacement parts Assembly of ComponentsSensor assembly and solenoid valve access Infrared Window Sprayhead Body NUT Solution Remove debris between diaphragm and the valve seat Troubleshooting BIR3 ComponentsSolenoid Valve S07-072 closed body and S07-072A thru body Thermostatic Mixing Valve Maintenance and Troubleshooting Problem Limited water flowProblem External leaks in the system Repair Kit S65-259 Vernatherm Thermostatic Mixing Valve S01-524