CONVEYOR BELT ASSEMBLING AND DISASSEMBLING (Fig. 12)
Install the conveyor belt so that it always runs in | 1 |
the direction indicated by this arrow — the closed |
|
end of the loop toward the direction of travel.
The arrows in the belt illustrate the movement of the splicing strand between steps.
When bending the splicing strand, try to limit bending to straight portions of the strand rather than in the "Z" bend area.
Splice one side completely before starting the other side.
After completely splicing the belt, it is advisable to go along the width of the belt straightening the
Depending upon the width of the belt, there might be one, two, or three splicing strands.
2
3
4
5
6
7
Fig. 12
— 21 —