Installation, Operation and Care of
MODEL HGC SERIES GAS CONVEYOR OVENS
PLEASE KEEP THIS MANUAL FOR FUTURE USE
GENERAL
Hobart ovens are produced with quality workmanship and material. Proper installation, usage and maintenance of your oven will result in many years of satisfactory performance.
It is suggested that you thoroughly read this entire manual and carefully follow all of the instructions provided.
INSTALLATION
Before installing, verify that the electrical service and type of gas supply (natural or propane) agree with the specifications on the rating plate located on the right front side panel. If the supply and equipment requirements do not agree, do not proceed with the installation. Contact your Hobart service representative immediately.
UNPACKING
This oven was inspected before leaving the factory. The transportation company assumes full responsibility for safe delivery upon acceptance of the shipment. Immediately after unpacking, check for possible shipping damage. If the oven is found to be damaged, save the packaging material and contact the carrier within 15 days of delivery.
1.Tilt the oven on its back side.
2.Place the oven on a
3.Move oven to its installation position.
4.Remove the oven from the dolly and place on two pieces of 2 x 4 wood.
5.Carefully unpack the oven.
Do not use the door or the handle to lift the oven.
— 4 —