Frymaster 1814E operation manual Clearance and Ventilation, Australian Requirements

Page 10

DANGER

Do not attach an apron drainboard to a single fryer. The fryer may become unstable, tip over and cause injury. The appliance area must be kept free and clear of combustible material at all times.

DANGER

Building codes prohibit a fryer with its open tank of hot oil being installed beside an open flame of any type, including those of broilers and ranges.

In the event of a power failure, the fryer(s) will automatically shut down. If this occurs, turn the power switch OFF. Do not attempt to start the fryer(s) until power is restored.

2.1.1 Clearance and Ventilation

This appliance must be kept free and clear of combustible material.

A clearance of 6 inches (15cm) must be provided at both sides and back adjacent to combustible construction. A minimum of 24 inches (61cm) should be provided at the front of the equipment for servicing and proper operation.

WARNING

Do not block the area around the base or under the fryers.

2.1.2 Electrical Grounding Requirements

All electrically operated appliances must be grounded in accordance with all applicable national and local codes, and, where applicable, CE codes. All units (cord connected or permanently connected) should be connected to a grounded power supply system. A wiring diagram is located on the inside of the fryer door. Refer to the rating plate on the inside of the fryer door for proper voltages.

2.1.3 Australian Requirements

To be installed in accordance with AS 5601 / AG 601, local authority, gas, electricity, and any other relevant statutory regulations.

2-2

Image 10
Contents Hour Service Hotline Frymaster 1814E Series Electric FryerCanada Page Typical Configuration 31814E Shown Table of Contents General Safety InformationController Information European Community CE Specific Information DefinitionsShipping Damage Claim Procedure Service InformationGeneral Clearance and Ventilation Australian RequirementsPower Requirements Three 3 Phase RequirementsFrypot Boil Out Page Equipment Setup and Shutdown Procedures Shutdown ControllersPage Filter Preparation Filter Components Assembling the Filter Return filter pan to cabinet Installing the Filter Filtering Tools Operating the Filter 4.5.1 Filter Operation Filter Operation Overfill the FrypotFilter Pump Reset Switch Draining and Disposing of Waste Oil Clean the Frypot and Heating Elements- Weekly Annual/Periodic System Inspection FryerBuilt-In Filtration System Page Before calling a service agent or the Frymaster Hotline IntroductionProblem Probable Causes Corrective Action Troubleshooting Controller and Heating ProblemsFiltration Problems Error MessagesPart Number Description User Replaceable PartsFilter Pan Components This page Intentionally Left Blank Service Hotline