K-Tec manual Use and setup of the oscilloscope for the MT2000, Prerequisites, Channel B

Page 28

9.5APPENDIX E: Oscilloscope Use & Setup for Troubleshooting

9.5.1General Setup

Connect Channel A to Pin 6

Connect GND to Pin 3

Connect Trigger to External to Pin 4

Set Volts to 500 mV / div

Set Time to 50 ųSec / div

Your output should resemble this:

Pin 6 Return

Signal

Pin 5

Not used

Pin 4

Sync Pulse

Pin 1 Not used

Pin 2 Not used

Pin 3 Ground or Common

Figure 9.4

9.5.2Use and setup of the oscilloscope for the MT2000

Prerequisites:

Requires a Dual Channel Oscilloscope

Procedure is based upon Fluke portable Oscilloscopes

Scope Settings:

Channel A:

Connect Probe A tip to “Signal 2”

Set Range to 1 Volt / Div.

Set input A to DC Coupled

Connect probe grounds to “Common”

Channel B:

Connect Probe tip to “Sync. Pulse”; Note: “Sync Pulse” is actually the Blanking Signal and its position changes when BLK is changed.

Set range to 1 volt/div

Set input B to DC coupled

Set time to ~500 uSec/Div.

Change timing and trigger: up and down as needed to see top fo probe or the whole probe length, de- pending on overall length

Set Trigger to Channel B, set level at 2 volts, “negative slope”, “wait for trigger”, “recurrent”, per scope options in trigger menu.

Set time delay to –2 division

NOTE: The signal waveform will be visible on Channel A. When changing the Blanking (BLK) the waveform will move. Increasing BLK will shift the waveform to the left. If the scope time delay is set to –2 Div., then set the blank- ing so that any coupler pulses below 2 vdc are to the left of the end of the second division. Set THV to a value that crosses the wanted signal, but does not cross any other baseline down going “bumps”.

28

MT2000-0200-01 Rev f (10-2007) DCN0160

Image 28
Contents Guided Wave Radar Level Transmitter Table of Contents List of Figures AppendicesIntroduction Ambient Temperature OverviewStorage Information Measurement cycle consists of the followingDirect Reflect Mode standard cont’d Ultra Low Dielectric ULD Measure MethodInstallation Mounting RequirementsFactory Default Configuration Shortening of ProbeMT2000 Guided Wave Radar Guidelines URV = Probe Length LRV = 0 in. / 0 mmWiring Quickstart ProcedureCommissioning MT2000 Guided Wave Radar Guidelines cont’dVerify Proper Power-Up Quickstart Procedure cont’dSetting the 4mA and 20 mA Points Using the Pushbutton Menu LCD Menu Operation Calibration MenuDetailed Configuration Parameters Direct Mode Blanking Menu Threshold Level Parameter THV and Gain Setting GSAdvanced Parameter Settings Threshold Level Parameter THV and Gain Setting GS cont’dL1O Advanced Parameter Settings cont’d KO & KG= H * Sqrt DC H + L Ultra Low Dielectric ULD Mode ConfigurationDC = I + H L / H2 Ultra Low Dielectric ULD Mode Configuration cont’d Advanced Output ConfigurationSetting the DAC trim DAC TrimFigure6 4mA & 20mA Calibration Using Actual Level Input Bench Calibration of the 4mA & 20mA PointsReversing The Output Action Using Actual Level Input Jumper Switch SettingsPossible Symptoms Troubleshooting InformationValid Current Loop Outputs Possible Symptoms cont’d Electronics Module ReplacementHoneywell DE Output Option Interoperability and Conformance ClassHart Protocol Interface Option Operating ModesHart Communicator CompatibilityGlossary of Terms LRVAppendices Appendix a Sensor TrimConfiguration 2 Hidden Menu END CFG MenuTMP To access the linearization table Setting up Linearization Table PointsAppendix C Linearization To clear the linearization tableAppendix D Interface Applications MT2000 InterfaceUse and setup of the oscilloscope for the MT2000 Scope Settings Channel aPrerequisites Channel BAppendix F CE Certificate of Conformity Appendix G Exida Certificate MT2000-0200-1 Rev f 10-2007 DCN0160 MT2000-0200-01 Rev f 10-2007 DCN0160 MT2000-0200-1 Rev f 10-2007 DCN0160 Appendix I Mounting Configurations 3a, 3b10a 10bAppendix J Warranty Statement Year Warranty for