Bunn ITCB-DV manual Programming the Brewer, Important Programming Notes Read Carefully, Screen

Page 15

PROGRAMMING THE BREWER

The programming of the brewer is divided into two levels. There is one function in Level 1. All other functions are accessed in Level 2.

The following function screens are in order of appearance. Each screen will have instructions on how to access and the procedures to program the various functions of the brewer.

IMPORTANT PROGRAMMING NOTES

- READ CAREFULLY -

To exit the programming mode at any time, press and release the ON/OFF pad located on the front switch panel. The display will return to the MAIN SCREEN.

If none of the five programming switches are pressed within one minute during the setup of the brewer, the programming of the function screen that is being set will be exited and the display will return to the MAIN

SCREEN.

Always remember to place a container and funnel under the sprayhead when operating the brewer during the set-up of CALIBRATE FLOW, and testing the brew and dilution valves in SERVICE TOOLS/TEST OUTPUTS.

MAIN SCREEN

READY TO BREW

WATER TEMP: 205°

BREW

BREW

BREW

A

B

C

This screen will be shown when the brewer is ready for use. The screen displays the water temperature in the tank. When the water in the tank reaches the correct set temperature, the display will change from HEATING to READY TO BREW.

PROGRAMMING LOCKOUT SWITCH ((located on the memory module board prior to S/N ICB0007479

-located on the main circuit board S/N ICB0007479 and after))

This switch can be set to prevent access to the programming settings of the brewer. Once all the cor- rect brew settings are programmed, the operator can set the switch to the "ON" position to prohibit anyone from changing the settings. With the switch in the "ON" position, the programming menus can still be accessed to view the current settings. However, no changes will be saved.

UNLOCK

MEMORY

 

LOCK

 

PROGRAMMING

LOCKOUT SWITCH

P3048

Page 15

36748 070706

 

Image 15
Contents Phone 217 529-6601 FAX 217 Post Office BOX SPRINGFIELD, IllinoisBUNN-O-MATIC Commercial Product Warranty Introduction Dual Voltage MachineVolt Machine User Notices Ptional &IELD 7IRING 0 7IRE .$  #29710.00090 7IRE .$  #29710.0010 A separate conductor For earth ground Dual Volt Toggle Switch Electrical HOOK-UPElectrical Requirements Conductor for earth groundPlumbing Requirements Plumbing Hook UPTank Drain Operating Controls Repeat for Brew B and Brew C Make sure the ON/OFF switch is OFF LED will not be litInitial SET-UP Viewing Assigned Recipes & Asset NumberWith a Smart Funnel and G9-2T DBC or MHG Grinder TEA BrewingCoffee Brewing Without a Smart Funnel and G9-2T DBC GrinderMedium Cleaning Glossary Glossary Programming Switches ProgrammingProgramming Section Screen Programming the BrewerImportant Programming Notes Read Carefully Ready to Brew Water TempProgramming the Brewer Programming Functions Flow ChartProgramming Functions Level Brew Lockout Procedure for setting Brew LockoutProcedure for setting Language Programming the Brewer Programming Functions Level 2SET Language Units Procedure for setting the UnitsReview Recipes Modify recipe, set up standard recipes Procedure for reviewing the recipesModify Show and Next Assign Recipe Master Temp YES Using a Smart Funnel and a G9-2T DBC or MHG GrinderDONE? Coffee Name Show Quit Save Coffee Name Setup CompleteReady to Brew Water Temp Card Contains Recipe forCoffee Name Modify Show Next Review RECIPES? No YESStored in the brewer’s memory If the brewing information is not correct, or it isBrew OZ XX.X Done + Review Recipes No YESTEA Modify Show Next Recipe Name Modify Show NextDilute Dely Done + Brew OZBatches DONE? Water for that particular batch size SET Pulse Brew No YESTea recipe to be modified Read Dilute OZTEA Recipes SET Pulse Brew Setting Pulse Brew Easy Pulse BrewRead Dilute Dely BrewRead Select Method Press and release DONE. The display should read Press and release YES. The display should now read Dilute OZOFF Time 1ST on TimeSET Pulse Brew No YES Select Method Easy Next ManualRead 2 Batches DONE? Setting for the batch size just programmed. AfterOccurs for that batch size StepNO-NAME Coffee Modify Show Next Coffee recipe to be modifiedSCREEN, press and release the ON/OFF button Last on Time Pre-Infusion to 4 minutes Coffee Recipes SET Pulse BrewRepeat steps 10, 11 Size to display the settings for that batch. After aDirectly to step Read SET Pulse BrewPress and release DONE. The display should read TEA Modify Show Next Coffee Recipes Drip Time Pulse BrewRepeat steps 8 through Master Temp Using -and +, adjust the brew and faucet tem- peratureProcedure to set ready temperature Range 2 to 20 F 1 10 C Using -and +, adjust the ready temperatureReady Degree Write Enable ADSProcedure to Enable/Disable Ads Procedure to Write an AdCard no Write From the NEW AD? screen, press and release CardEnabl Sanitation Procedure for enabling sanitation Range 0.0 to 72.0 hrsDone Enable EnergysavrProcedure to enable energy savings mode EnableFreshTimerXXX Refill Enable Fresh TimerTimer CoffeeRange 0 to RefillSpray OZ/M Procedure to adjust the sprayhead flow rate set- tingDilute OZ/M Procedure to adjust the dilution flow rate settingCalibrate Spray Quit Start Calibrate FLOW? No YESSpray Head CAL No YES Container READY? Quit YESContainer READY? Quit YES Calibrate FLOW? No YESSpray Head CAL No YES Dilution CAL? No YESBrew COUNTERS? No YES Brew a Xxxx Next ResetBrew B Xxxx Next Reset Brew C Xxxx Next ResetYES SET Recipe TempsTemps ToolsPress and release YES. The display will now read Procedure to enter the asset numberAsset Number Enter Asset #?Service TOOLS? Service NumberProcedure to enter the service number Enter Service #?Following components can be individually tested Brew Valve Service ToolsProcedure to test components and outputs Test SwitchesP2883 36748 Right Hidden To Exit Nothing Pressed Service TOOLS? No YESTest SWITCHES? No YES Test OUTPUTS? No YESQuency DoneDefaults Factory Defaults No YESWill Replace ALL Brew Settings Are YOU SURE? No YES Factory DefaultsTEA 3 Recipe Factory Default ValuesTEA 1 Recipe TEA 2 RecipeNO-NAME Coffee Recipe Factory Default ValuesHOT TEA Recipe Iced Coffee RecipeTroubleshooting Remedy TroubleshootingProblem Probable CauseControl Board Problem Probable Cause RemedyBrew switch Brew valveTank drain clamp Problem Probable CauseAutomatic refill will not operate No water LongAutomatic refill will not operate or Refill valve Check the wiring harnessTo it is secure Water flows into tank continuously Refill valveTing If the left three digit numberHeating Time TOO Long Working order Problem is foundTank heaters Connect a voltmeter acrossObstructions. Clear or replace TionStrainer Direction of flow arrow must be Move the strainer and check forLime buildup Temperature probe Control Board Funnel tip Head for lime buildup Brew volume adjustmentImproper water pressure 90 psi 138 and 620 kPaBrew cycle should be started For proper extractionProper extraction Water temperatureWeak beverage Type of paper filter Coffee or tealeavesRemove and clean lime off tank heaters SolenoidsPlumbing lines Water supply Tank heaters Schematic Wiring Diagram ITCB-DV #%-!4#72. $!2!- I4#! I4# Schematic Wiring Diagram ITCB-C-DV