Bunn ITCB-DV manual Initial SET-UP, Viewing Assigned Recipes & Asset Number

Page 9

INITIAL SET-UP

1. Insert an empty funnel into the funnel rails.

2. Place an empty server under the funnel.

3. Connect the brewer to the power source. Make sure the ON/OFF switch is ON (LED will be lit).

4. Water will flow into the tank and stop when the tank is filled to its capacity. Display will show PLEASE WAIT...TANK FILLING until tank is filled with water.

5. Wait approximately twenty minutes for the water in the tank to heat to the proper temperature. Display will show READY TO BREW...WATER TEMP: 205° when tank is at operating temperature. Some water will drip from the funnel during this time; this is due to expansion and should not occur thereafter.

6. Place a small vessel beneath the faucet and open the faucet handle. Release it when you hear the tank refilling.

7. Water volumes and flow settings have been preset at the factory. Refer to adjustments for the Set Brew Volumes section of this manual should the volume need to be increased or decreased.

8. The brewer is now ready for use in accordance with the instructions for Tea Brewing and Coffee Brewing.

VIEWING ASSIGNED RECIPES & ASSET NUMBER

1.Make sure the ON/OFF switch is OFF (LED will not be lit).

2.Press and hold BREW A. The display will show the name of the recipe assigned to Brew A along with SWITCH NOT ON. This is to indicate that a brew cannot be initiated while the ON/OFF switch is OFF.

3.Repeat for BREW B and BREW C.

4.Make sure the ON/OFF switch is OFF. To view the asset number of the machine, press and hold the left hid- den button until the display reads: ANXXXXXX...ASSET NUMBER. Release the left hidden button.

5.After a 5 second delay, the display will read: ITCBXXXXXX. This is the serial number of the machine.

Page

36748 101505

 

Image 9
Contents Phone 217 529-6601 FAX 217 Post Office BOX SPRINGFIELD, IllinoisBUNN-O-MATIC Commercial Product Warranty Introduction Dual Voltage MachineVolt Machine User Notices Ptional &IELD 7IRING 0 7IRE .$  #29710.00090 7IRE .$  #29710.0010 Electrical Requirements Dual Volt Toggle Switch Electrical HOOK-UPConductor for earth ground A separate conductor For earth groundPlumbing Requirements Plumbing Hook UPTank Drain Operating Controls Initial SET-UP Make sure the ON/OFF switch is OFF LED will not be litViewing Assigned Recipes & Asset Number Repeat for Brew B and Brew CCoffee Brewing TEA BrewingWithout a Smart Funnel and G9-2T DBC Grinder With a Smart Funnel and G9-2T DBC or MHG GrinderMedium CleaningGlossary Glossary Programming Switches ProgrammingProgramming Section Important Programming Notes Read Carefully Programming the BrewerReady to Brew Water Temp ScreenProgramming the Brewer Programming Functions Flow ChartProgramming Functions Level Brew Lockout Procedure for setting Brew LockoutProcedure for setting Language Programming the Brewer Programming Functions Level 2SET Language Units Procedure for setting the UnitsReview Recipes Modify recipe, set up standard recipes Procedure for reviewing the recipesModify Show and Next Assign Recipe Master Temp YES Using a Smart Funnel and a G9-2T DBC or MHG GrinderDONE? Ready to Brew Water Temp Coffee Name Setup CompleteCard Contains Recipe for Coffee Name Show Quit SaveStored in the brewer’s memory Review RECIPES? No YESIf the brewing information is not correct, or it is Coffee Name Modify Show NextTEA Modify Show Next Review Recipes No YESRecipe Name Modify Show Next Brew OZ XX.X Done +Dilute Dely Done + Brew OZBatches DONE? Tea recipe to be modified SET Pulse Brew No YESRead Dilute OZ Water for that particular batch sizeTEA Recipes SET Pulse Brew Setting Pulse Brew Easy Pulse BrewRead Dilute Dely BrewRead Select Method Press and release DONE. The display should read Press and release YES. The display should now read Dilute OZSET Pulse Brew No YES 1ST on TimeSelect Method Easy Next Manual OFF TimeOccurs for that batch size Setting for the batch size just programmed. AfterStep Read 2 Batches DONE?NO-NAME Coffee Modify Show Next Coffee recipe to be modifiedSCREEN, press and release the ON/OFF button Last on Time Pre-Infusion to 4 minutes Coffee Recipes SET Pulse BrewDirectly to step Size to display the settings for that batch. After aRead SET Pulse Brew Repeat steps 10, 11Press and release DONE. The display should read TEA Modify Show Next Coffee Recipes Drip Time Pulse BrewRepeat steps 8 through Master Temp Using -and +, adjust the brew and faucet tem- peratureProcedure to set ready temperature Range 2 to 20 F 1 10 C Using -and +, adjust the ready temperatureReady Degree Procedure to Enable/Disable Ads Enable ADSProcedure to Write an Ad WriteCard no Write From the NEW AD? screen, press and release CardEnabl Sanitation Procedure for enabling sanitation Range 0.0 to 72.0 hrsProcedure to enable energy savings mode Enable EnergysavrEnableFreshTimer DoneTimer Enable Fresh TimerCoffee XXX RefillRange 0 to RefillSpray OZ/M Procedure to adjust the sprayhead flow rate set- tingDilute OZ/M Procedure to adjust the dilution flow rate settingSpray Head CAL No YES Calibrate FLOW? No YESContainer READY? Quit YES Calibrate Spray Quit StartSpray Head CAL No YES Calibrate FLOW? No YESDilution CAL? No YES Container READY? Quit YESBrew B Xxxx Next Reset Brew a Xxxx Next ResetBrew C Xxxx Next Reset Brew COUNTERS? No YESTemps SET Recipe TempsTools YESAsset Number Procedure to enter the asset numberEnter Asset #? Press and release YES. The display will now readProcedure to enter the service number Service NumberEnter Service #? Service TOOLS?Procedure to test components and outputs Service ToolsTest Switches Following components can be individually tested Brew ValveP2883 36748 Test SWITCHES? No YES Service TOOLS? No YESTest OUTPUTS? No YES Right Hidden To Exit Nothing PressedQuency DoneWill Replace ALL Brew Settings Are YOU SURE? No YES Factory Defaults No YESFactory Defaults DefaultsTEA 1 Recipe Factory Default ValuesTEA 2 Recipe TEA 3 RecipeHOT TEA Recipe Factory Default ValuesIced Coffee Recipe NO-NAME Coffee RecipeTroubleshooting Problem TroubleshootingProbable Cause RemedyBrew switch Problem Probable Cause RemedyBrew valve Control BoardAutomatic refill will not operate No water Problem Probable CauseLong Tank drain clampAutomatic refill will not operate or Refill valve Check the wiring harnessTing Water flows into tank continuously Refill valveIf the left three digit number To it is secureHeating Time TOO Long Tank heaters Problem is foundConnect a voltmeter across Working orderStrainer Direction of flow arrow must be TionMove the strainer and check for Obstructions. Clear or replaceLime buildup Temperature probe Control Board Funnel tip Improper water pressure Brew volume adjustment90 psi 138 and 620 kPa Head for lime buildupBrew cycle should be started For proper extractionWeak beverage Type of paper filter Water temperatureCoffee or tealeaves Proper extractionRemove and clean lime off tank heaters SolenoidsPlumbing lines Water supply Tank heaters Schematic Wiring Diagram ITCB-DV #%-!4#72. $!2!- I4#! I4# Schematic Wiring Diagram ITCB-C-DV

ITCB-DV specifications

The Bunn ITCB-DV is a commercial coffee brewer known for its efficiency, versatility, and excellent brewing capabilities. Designed for high-demand environments like restaurants, cafes, and other food service establishments, this machine stands out due to its innovative features and technologies that enhance user experience and brewing quality.

One of the main features of the Bunn ITCB-DV is its dual voltage system, allowing it to operate efficiently at both 120V and 240V. This adaptability makes it suitable for a variety of locations without compromising performance. The brewer is designed to brew up to 3.8 gallons of coffee per hour, making it perfect for busy settings where speed and volume are critical.

The ITCB-DV is equipped with a unique Smart Brew technology that ensures precise brewing temperatures and times. This feature guarantees optimal extraction of coffee flavors, resulting in a consistently delicious and aromatic brew. Additionally, the brewer incorporates a digital brew counter that helps users track daily coffee production, allowing for better inventory management.

With an adjustable brew basket and multiple batch sizes, the Bunn ITCB-DV caters to diverse brewing needs. Whether preparing single servings or larger quantities, the brewer accommodates various coffee preferences. The machine is also compatible with Bunn's airpot systems, ensuring that fresh coffee is easily accessible and can be served quickly to customers.

In terms of construction, the Bunn ITCB-DV is built to last. It features a stainless steel exterior that not only adds a sleek appearance but also ensures durability against the rigors of commercial use. Furthermore, the brewer has a front-loading design, which allows for easy access and maintenance, minimizing downtime.

The ITCB-DV is also energy-efficient, featuring a low-wattage option that reduces electricity consumption without sacrificing brewing quality. This characteristic not only helps in cutting down operational costs but also appeals to eco-conscious businesses aiming to reduce their environmental footprint.

Overall, the Bunn ITCB-DV is a reliable and feature-rich coffee brewing solution tailored for high-volume environments. Its combination of advanced technologies, user-friendly design, and robust construction makes it an excellent choice for businesses committed to delivering exceptional coffee experiences. With this brewer, operators can ensure that their customers always enjoy top-quality coffee, brewed with precision and care.