Bunn ITCB-DV manual Enable ADS, Procedure to Enable/Disable Ads, Procedure to Write an Ad

Page 42

PROGRAMMING THE BREWER (cont.)

PROGRAMMING FUNCTIONS - LEVEL 2 (cont.)

ENABLE ADS

This function allows the operator to choose whether or not to display an advertising message. An ad can be saved to the brewer by either writing the ad using the programming commands, or by entering the ad into the brewer using an AD CARD. This message will be displayed when the brewer is not in use.

Procedure to Enable/Disable Ads:

1.Press and hold the right hidden button until the display reads SET LANGUAGE. Press the right hid- den button until the display reads ENABLE ADS. The YES or NO will be flashing to indicate the current selection.

2.Press and release the NO button to disable this function (no ads will be displayed on the screen), or:

3.Press and release the YES button to enable this function (ads will be displayed on the screen).

4.When finished, press and release DONE to save the new setting and advance to the next function screen.

5.If NO was selected, the display should now read ENABLE SANITATION. To exit programming and return to the MAIN SCREEN, press and release the ON/OFF pad.

6.If YES was selected, the display should now read NEW AD?. This screen allows the operator to select between using an ad card to read in a new ad, writing an ad, or using the ad currently stored in the brewer’s memory (if an ad was previously saved).

Procedure to WRITE an Ad:

NOTE: Writing and saving a new ad will erase any previously saved ad in the brewer’s memory.

7.From the NEW AD? screen, press and release

WRITE.

8.The display should now read 2 LINES 16 CHARS AVAILABLE, and then SCROL THRU ALPHA, NEXT -> NEXT LETTER, and then WRITE TOP LINE?. The ad can be up to 32 characters long, 16 per line. The ad will be written in two steps, first the top line, then the bottom line.

9.To write the top line of a new ad, press and release YES. To skip the top line and only write a bottom

line, press and release NO and proceed to step

13. To exit programming and return to the MAIN SCREEN, press and release the ON/OFF pad.

10.The display will now read A with a flashing cursor below it. Press and hold the SCROLL button to scroll through the alphabet and available characters. When the desired character is shown on the display, press and release NEXT to move to the next character in the top line.

11.Repeat step 10 until the top line is complete.

12.Press and release DONE. The display should now read WRITE BTM LINE?.

13.To write the bottom line of the new ad, press and release YES.

14.To skip the bottom line, press and release NO.

a.If neither a top nor bottom line was written, the display should now read ENABL SANITATION.

b.If only a top line was written, the ad will be displayed followed by SAVE? Proceed to step 18.

15.The display will now read A with a flashing cursor below it. Press and hold the SCROLL button to scroll through the alphabet and available charac- ters. When the desired character is shown on the display, press and release NEXT to move to the next character in the bottom line.

16.Repeat step 15 until the bottom line is complete.

17.Press and release DONE. The display will now show the written ad, and then SAVE?

18.To cancel saving the ad, press and release NO. The display should now read ADVERTISEMENT NOT SAVED! and then will return to the NEW AD screen. To exit programming and return to the MAIN SCREEN, press and release the ON/OFF pad.

19.To correct or edit the ad, press and release EDIT. The display should now read WRITE TOP LINE? Repeat steps 10 though 17.

20.To save the ad as it is shown, press and release YES. The display should now read ADVERTISE- MENT SETUP COMPLETE, and then ENABL SANITA- TION. To exit programming and return to the MAIN SCREEN, press and release the ON/OFF pad.

Page 42

36748 041504

 

Image 42
Contents Post Office BOX SPRINGFIELD, Illinois Phone 217 529-6601 FAX 217BUNN-O-MATIC Commercial Product Warranty Introduction Dual Voltage MachineVolt Machine User Notices Ptional &IELD 7IRING 0 7IRE .$  #29710.00090 7IRE .$  #29710.0010 Conductor for earth ground Dual Volt Toggle Switch Electrical HOOK-UPElectrical Requirements A separate conductor For earth groundPlumbing Requirements Plumbing Hook UPTank Drain Operating Controls Viewing Assigned Recipes & Asset Number Make sure the ON/OFF switch is OFF LED will not be litInitial SET-UP Repeat for Brew B and Brew CWithout a Smart Funnel and G9-2T DBC Grinder TEA BrewingCoffee Brewing With a Smart Funnel and G9-2T DBC or MHG GrinderCleaning MediumGlossary Glossary Programming Switches ProgrammingProgramming Section Ready to Brew Water Temp Programming the BrewerImportant Programming Notes Read Carefully ScreenProgramming Functions Flow Chart Programming the BrewerProcedure for setting Brew Lockout Programming Functions Level Brew LockoutProcedure for setting Language Programming the Brewer Programming Functions Level 2SET Language Procedure for setting the Units UnitsReview Recipes Modify recipe, set up standard recipes Procedure for reviewing the recipesModify Show and Next Assign Recipe Using a Smart Funnel and a G9-2T DBC or MHG Grinder Master Temp YESDONE? Card Contains Recipe for Coffee Name Setup CompleteReady to Brew Water Temp Coffee Name Show Quit SaveIf the brewing information is not correct, or it is Review RECIPES? No YESStored in the brewer’s memory Coffee Name Modify Show NextRecipe Name Modify Show Next Review Recipes No YESTEA Modify Show Next Brew OZ XX.X Done +Dilute Dely Done + Brew OZBatches DONE? Read Dilute OZ SET Pulse Brew No YESTea recipe to be modified Water for that particular batch sizeSetting Pulse Brew Easy Pulse Brew TEA Recipes SET Pulse BrewRead Dilute Dely BrewRead Select Method Press and release YES. The display should now read Dilute OZ Press and release DONE. The display should readSelect Method Easy Next Manual 1ST on TimeSET Pulse Brew No YES OFF TimeStep Setting for the batch size just programmed. AfterOccurs for that batch size Read 2 Batches DONE?NO-NAME Coffee Modify Show Next Coffee recipe to be modifiedSCREEN, press and release the ON/OFF button Coffee Recipes SET Pulse Brew Last on Time Pre-Infusion to 4 minutesRead SET Pulse Brew Size to display the settings for that batch. After aDirectly to step Repeat steps 10, 11Press and release DONE. The display should read TEA Modify Show Next Coffee Recipes Drip Time Pulse BrewRepeat steps 8 through Using -and +, adjust the brew and faucet tem- perature Master TempProcedure to set ready temperature Range 2 to 20 F 1 10 C Using -and +, adjust the ready temperatureReady Degree Procedure to Write an Ad Enable ADSProcedure to Enable/Disable Ads WriteFrom the NEW AD? screen, press and release Card Card no WriteProcedure for enabling sanitation Range 0.0 to 72.0 hrs Enabl SanitationEnableFreshTimer Enable EnergysavrProcedure to enable energy savings mode DoneCoffee Enable Fresh TimerTimer XXX RefillRefill Range 0 toProcedure to adjust the sprayhead flow rate set- ting Spray OZ/MProcedure to adjust the dilution flow rate setting Dilute OZ/MContainer READY? Quit YES Calibrate FLOW? No YESSpray Head CAL No YES Calibrate Spray Quit StartDilution CAL? No YES Calibrate FLOW? No YESSpray Head CAL No YES Container READY? Quit YESBrew C Xxxx Next Reset Brew a Xxxx Next ResetBrew B Xxxx Next Reset Brew COUNTERS? No YESTools SET Recipe TempsTemps YESEnter Asset #? Procedure to enter the asset numberAsset Number Press and release YES. The display will now readEnter Service #? Service NumberProcedure to enter the service number Service TOOLS?Test Switches Service ToolsProcedure to test components and outputs Following components can be individually tested Brew ValveP2883 36748 Test OUTPUTS? No YES Service TOOLS? No YESTest SWITCHES? No YES Right Hidden To Exit Nothing PressedDone QuencyFactory Defaults Factory Defaults No YESWill Replace ALL Brew Settings Are YOU SURE? No YES DefaultsTEA 2 Recipe Factory Default ValuesTEA 1 Recipe TEA 3 RecipeIced Coffee Recipe Factory Default ValuesHOT TEA Recipe NO-NAME Coffee RecipeTroubleshooting Probable Cause TroubleshootingProblem RemedyBrew valve Problem Probable Cause RemedyBrew switch Control BoardLong Problem Probable CauseAutomatic refill will not operate No water Tank drain clampCheck the wiring harness Automatic refill will not operate or Refill valveIf the left three digit number Water flows into tank continuously Refill valveTing To it is secureHeating Time TOO Long Connect a voltmeter across Problem is foundTank heaters Working orderMove the strainer and check for TionStrainer Direction of flow arrow must be Obstructions. Clear or replaceLime buildup Temperature probe Control Board Funnel tip 90 psi 138 and 620 kPa Brew volume adjustmentImproper water pressure Head for lime buildupFor proper extraction Brew cycle should be startedCoffee or tealeaves Water temperatureWeak beverage Type of paper filter Proper extractionRemove and clean lime off tank heaters SolenoidsPlumbing lines Water supply Tank heaters Schematic Wiring Diagram ITCB-DV #%-!4#72. $!2!- I4#! I4# Schematic Wiring Diagram ITCB-C-DV

ITCB-DV specifications

The Bunn ITCB-DV is a commercial coffee brewer known for its efficiency, versatility, and excellent brewing capabilities. Designed for high-demand environments like restaurants, cafes, and other food service establishments, this machine stands out due to its innovative features and technologies that enhance user experience and brewing quality.

One of the main features of the Bunn ITCB-DV is its dual voltage system, allowing it to operate efficiently at both 120V and 240V. This adaptability makes it suitable for a variety of locations without compromising performance. The brewer is designed to brew up to 3.8 gallons of coffee per hour, making it perfect for busy settings where speed and volume are critical.

The ITCB-DV is equipped with a unique Smart Brew technology that ensures precise brewing temperatures and times. This feature guarantees optimal extraction of coffee flavors, resulting in a consistently delicious and aromatic brew. Additionally, the brewer incorporates a digital brew counter that helps users track daily coffee production, allowing for better inventory management.

With an adjustable brew basket and multiple batch sizes, the Bunn ITCB-DV caters to diverse brewing needs. Whether preparing single servings or larger quantities, the brewer accommodates various coffee preferences. The machine is also compatible with Bunn's airpot systems, ensuring that fresh coffee is easily accessible and can be served quickly to customers.

In terms of construction, the Bunn ITCB-DV is built to last. It features a stainless steel exterior that not only adds a sleek appearance but also ensures durability against the rigors of commercial use. Furthermore, the brewer has a front-loading design, which allows for easy access and maintenance, minimizing downtime.

The ITCB-DV is also energy-efficient, featuring a low-wattage option that reduces electricity consumption without sacrificing brewing quality. This characteristic not only helps in cutting down operational costs but also appeals to eco-conscious businesses aiming to reduce their environmental footprint.

Overall, the Bunn ITCB-DV is a reliable and feature-rich coffee brewing solution tailored for high-volume environments. Its combination of advanced technologies, user-friendly design, and robust construction makes it an excellent choice for businesses committed to delivering exceptional coffee experiences. With this brewer, operators can ensure that their customers always enjoy top-quality coffee, brewed with precision and care.