Bunn ITCB-DV Setting for the batch size just programmed. After, Occurs for that batch size, Step

Page 33

PROGRAMMING THE BREWER (cont.)

PROGRAMMING FUNCTIONS - LEVEL 2 (cont.)

TEA RECIPES: DRIP TIME

This function allows the operator to adjust the DRIP TIME (time from end of sprayhead flow to when liquid stops dripping from the funnel). When the brew cycle is complete, the display will show DRIPPING and will countdown the time until the funnel empties.

Setting DRIP TIME:

Range: OFF to 5 minutes for all batch sizes.

NOTE: If the brewer is already in the DRIP TIME screen, skip steps 1 through 10 and proceed directly to step

14.If both batch sizes are not correct, press and release NO to return to the DRIP TIME setup screen and repeat steps 11 through 13.

15.If both batch sizes are correct, press YES. The display should show the name of the recipe be- ing programmed (modified) along with SETUP COMPLETE. After a 5 second delay, the display will advance to the next recipe name in the brewer’s memory. To exit to the MAIN SCREEN, press and release the ON/OFF button.

REVIEW RECIPES

NO YES

BREW

BREW

BREW

A

B

C

11.

1.

Press and hold the right hidden button until the dis-

 

play reads SET LANGUAGE. Press the right hidden

 

button until the display reads REVIEW RECIPES.

2.

Press YES to proceed. The display should now

 

read TEA 1, along with MODIFY SHOW NEXT.

3.

Press and release NEXT to advance to the desired

 

recipe to be modified.

4.

Press and release MODIFY. The display should read

 

BREW OZ:

5.

Press and release DONE. The display should read

 

2 BATCHES DONE?

6.

Press and release YES. The display should now

 

read DILUTE OZ:

7.

Press and release DONE. The display should read

 

2 BATCHES DONE?

8.

Press and release YES. The display should now

 

read DILUTE DELY:

PRESSING NO WILL ADVANCE TO NEXT FUNCTION SCREEN

ADVANCE TO THE

RECIPE TO BE

MODIFIED

TEA 1

MODIFY SHOW NEXT

BREW

BREW

BREW

A

B

C

(RECIPE NAME)

MODIFY SHOW NEXT

BREW

BREW

BREW

A

B

C

SET BREW OZ XX.X

SET DILUTE OZ XX.X

AND SET DILUTE DELAY

WHEN BOTH BATCHES ARE DONE,

PRESS YES TO ADVANCE TO

EASY PULSE BREW

SET PULSE BREW

NO YES

BREW

BREW

BREW

A

B

C

9. Press and release DONE. The display should now

show the Brew Oz, Dilution Oz, and Dilution Delay

setting for the batch size just programmed. After

a 5 second delay, the display will read SET PULSE

BREW.

 

DRIP TIME

X:XX

 

(-)

DONE

(+)

 

BREW

BREW

BREW

SET BOTH

BATCH SIZES

A

B

C

 

 

 

 

 

 

 

 

 

 

10.

Press and release NO. The display should now read

 

DRIP TIME and a batch light should be flashing.

11.

Using the (-)and (+), set the amount of time from

 

when the brew solenoid shuts off to when drip-out

 

occurs for that batch size.

12.

When finished, press the other batch size and repeat

 

step 11.

13.

When finished, press DONE. The display should

 

read 2 BATCHES DONE?

IF NO, RETURN TO

DRIP TIME

2 BATCHES DONE?

NO YES

BREW

BREW

BREW

A

B

C

(RECIPE NAME)

SETUP COMPLETE

AFTER A 5 SECOND DELAY,

DISPLAY WILL ADVANCE

TO NEXT RECIPE IN

BREWER MEMORY

P2865

Page 33

36748 051304

 

Image 33
Contents Phone 217 529-6601 FAX 217 Post Office BOX SPRINGFIELD, IllinoisBUNN-O-MATIC Commercial Product Warranty Introduction Dual Voltage MachineVolt Machine User Notices Ptional &IELD 7IRING 0 7IRE .$  #29710.00090 7IRE .$  #29710.0010 Electrical Requirements Dual Volt Toggle Switch Electrical HOOK-UPConductor for earth ground A separate conductor For earth groundPlumbing Requirements Plumbing Hook UPTank Drain Operating Controls Initial SET-UP Make sure the ON/OFF switch is OFF LED will not be litViewing Assigned Recipes & Asset Number Repeat for Brew B and Brew CCoffee Brewing TEA BrewingWithout a Smart Funnel and G9-2T DBC Grinder With a Smart Funnel and G9-2T DBC or MHG GrinderMedium CleaningGlossary Glossary Programming Switches ProgrammingProgramming Section Important Programming Notes Read Carefully Programming the BrewerReady to Brew Water Temp ScreenProgramming the Brewer Programming Functions Flow ChartProgramming Functions Level Brew Lockout Procedure for setting Brew LockoutProcedure for setting Language Programming the Brewer Programming Functions Level 2SET Language Units Procedure for setting the UnitsReview Recipes Modify recipe, set up standard recipes Procedure for reviewing the recipesModify Show and Next Assign Recipe Master Temp YES Using a Smart Funnel and a G9-2T DBC or MHG GrinderDONE? Ready to Brew Water Temp Coffee Name Setup CompleteCard Contains Recipe for Coffee Name Show Quit SaveStored in the brewer’s memory Review RECIPES? No YESIf the brewing information is not correct, or it is Coffee Name Modify Show NextTEA Modify Show Next Review Recipes No YESRecipe Name Modify Show Next Brew OZ XX.X Done +Dilute Dely Done + Brew OZBatches DONE? Tea recipe to be modified SET Pulse Brew No YESRead Dilute OZ Water for that particular batch sizeTEA Recipes SET Pulse Brew Setting Pulse Brew Easy Pulse BrewRead Dilute Dely BrewRead Select Method Press and release DONE. The display should read Press and release YES. The display should now read Dilute OZSET Pulse Brew No YES 1ST on TimeSelect Method Easy Next Manual OFF TimeOccurs for that batch size Setting for the batch size just programmed. AfterStep Read 2 Batches DONE?NO-NAME Coffee Modify Show Next Coffee recipe to be modifiedSCREEN, press and release the ON/OFF button Last on Time Pre-Infusion to 4 minutes Coffee Recipes SET Pulse BrewDirectly to step Size to display the settings for that batch. After aRead SET Pulse Brew Repeat steps 10, 11Press and release DONE. The display should read TEA Modify Show Next Coffee Recipes Drip Time Pulse BrewRepeat steps 8 through Master Temp Using -and +, adjust the brew and faucet tem- peratureProcedure to set ready temperature Range 2 to 20 F 1 10 C Using -and +, adjust the ready temperatureReady Degree Procedure to Enable/Disable Ads Enable ADSProcedure to Write an Ad WriteCard no Write From the NEW AD? screen, press and release CardEnabl Sanitation Procedure for enabling sanitation Range 0.0 to 72.0 hrsProcedure to enable energy savings mode Enable EnergysavrEnableFreshTimer DoneTimer Enable Fresh TimerCoffee XXX RefillRange 0 to RefillSpray OZ/M Procedure to adjust the sprayhead flow rate set- tingDilute OZ/M Procedure to adjust the dilution flow rate settingSpray Head CAL No YES Calibrate FLOW? No YESContainer READY? Quit YES Calibrate Spray Quit StartSpray Head CAL No YES Calibrate FLOW? No YESDilution CAL? No YES Container READY? Quit YESBrew B Xxxx Next Reset Brew a Xxxx Next ResetBrew C Xxxx Next Reset Brew COUNTERS? No YESTemps SET Recipe TempsTools YESAsset Number Procedure to enter the asset numberEnter Asset #? Press and release YES. The display will now readProcedure to enter the service number Service NumberEnter Service #? Service TOOLS?Procedure to test components and outputs Service ToolsTest Switches Following components can be individually tested Brew ValveP2883 36748 Test SWITCHES? No YES Service TOOLS? No YESTest OUTPUTS? No YES Right Hidden To Exit Nothing PressedQuency DoneWill Replace ALL Brew Settings Are YOU SURE? No YES Factory Defaults No YESFactory Defaults DefaultsTEA 1 Recipe Factory Default ValuesTEA 2 Recipe TEA 3 RecipeHOT TEA Recipe Factory Default ValuesIced Coffee Recipe NO-NAME Coffee RecipeTroubleshooting Problem TroubleshootingProbable Cause RemedyBrew switch Problem Probable Cause RemedyBrew valve Control BoardAutomatic refill will not operate No water Problem Probable CauseLong Tank drain clampAutomatic refill will not operate or Refill valve Check the wiring harnessTing Water flows into tank continuously Refill valveIf the left three digit number To it is secureHeating Time TOO Long Tank heaters Problem is foundConnect a voltmeter across Working orderStrainer Direction of flow arrow must be TionMove the strainer and check for Obstructions. Clear or replaceLime buildup Temperature probe Control Board Funnel tip Improper water pressure Brew volume adjustment90 psi 138 and 620 kPa Head for lime buildupBrew cycle should be started For proper extractionWeak beverage Type of paper filter Water temperatureCoffee or tealeaves Proper extractionRemove and clean lime off tank heaters SolenoidsPlumbing lines Water supply Tank heaters Schematic Wiring Diagram ITCB-DV #%-!4#72. $!2!- I4#! I4# Schematic Wiring Diagram ITCB-C-DV

ITCB-DV specifications

The Bunn ITCB-DV is a commercial coffee brewer known for its efficiency, versatility, and excellent brewing capabilities. Designed for high-demand environments like restaurants, cafes, and other food service establishments, this machine stands out due to its innovative features and technologies that enhance user experience and brewing quality.

One of the main features of the Bunn ITCB-DV is its dual voltage system, allowing it to operate efficiently at both 120V and 240V. This adaptability makes it suitable for a variety of locations without compromising performance. The brewer is designed to brew up to 3.8 gallons of coffee per hour, making it perfect for busy settings where speed and volume are critical.

The ITCB-DV is equipped with a unique Smart Brew technology that ensures precise brewing temperatures and times. This feature guarantees optimal extraction of coffee flavors, resulting in a consistently delicious and aromatic brew. Additionally, the brewer incorporates a digital brew counter that helps users track daily coffee production, allowing for better inventory management.

With an adjustable brew basket and multiple batch sizes, the Bunn ITCB-DV caters to diverse brewing needs. Whether preparing single servings or larger quantities, the brewer accommodates various coffee preferences. The machine is also compatible with Bunn's airpot systems, ensuring that fresh coffee is easily accessible and can be served quickly to customers.

In terms of construction, the Bunn ITCB-DV is built to last. It features a stainless steel exterior that not only adds a sleek appearance but also ensures durability against the rigors of commercial use. Furthermore, the brewer has a front-loading design, which allows for easy access and maintenance, minimizing downtime.

The ITCB-DV is also energy-efficient, featuring a low-wattage option that reduces electricity consumption without sacrificing brewing quality. This characteristic not only helps in cutting down operational costs but also appeals to eco-conscious businesses aiming to reduce their environmental footprint.

Overall, the Bunn ITCB-DV is a reliable and feature-rich coffee brewing solution tailored for high-volume environments. Its combination of advanced technologies, user-friendly design, and robust construction makes it an excellent choice for businesses committed to delivering exceptional coffee experiences. With this brewer, operators can ensure that their customers always enjoy top-quality coffee, brewed with precision and care.