Bunn ICB/TWIN, ITB/ITCB manual Membrane Switch Continuity

Page 12

MEMBRANE SWITCH

FIG. 12-1 MEMBRANE SWITCH

Location:

The Membrane Switch is located on the front face plate.

Test Procedures:

There are two methods for testing the membrane switch. The easiest method is to use the built in test mode. Refer to the Programing Section for Service Tools/Test Switches. If for some reason you can't get into the program modes, or brewer won't power up, you can test it with an ohmmeter or continuity tester. Refer to the schematic to trace the appropriate pins.

NOTE: Pin 22 is the static shield & will not provide a reading to the other pins.There are two commons in this circuit, pins 9 & 10.

Disconnect brewer from power source before disconnecting ribbon cable from control board.

Removal and Replacement:

1.Disconnect the ribbon cable from the 22-pin con- nector on the control board.

2.Gently peel the membrane switch from the front face plate assembly.

4Remove any adhesive that remains on the front face plate.

5.Remove the adhesive backing from the new mem- brane switch. Insert the ribbon cable through the slot in the front face plate and apply the membrane switch to the front face plate.

6.Connect the ribbon cable to the 22-pin connector on the control board making sure every pin on the control board is inserted into the ribbon cable connector.

Helpful

Hint

Wrap a thin paper clip around each meter lead and extend past the tip by ¼" - ½". You may need to sand off the clear coating on some clips!

FIG. 12-2 MEMBRANE SWITCH CONTINUITY

12

42461 0911809

 

Image 12
Contents ITB/ITCB ICB/TWIN BUNN-O-MATIC Commercial Product Warranty Introduction Troubleshooting Control BoardsTroubleshooting Refill Circuit ProblemProbable Cause RemedyHeating Circuit Problem Probable Cause Remedy Brewing Circuit Problem Probable Cause Remedy Troubleshooting Brewing Circuit Problem Probable Cause RemedyDiagnostics Message Probable Cause RemedyComponent Access ICB Component AccessControl Board Membrane Switch Membrane Switch ContinuityEarly Brew Valve Exploded ViewBrew Valve Late Models Late Model Brew ValveDisassembly Refill ValvesRefill Valves Early ICB Early ItcbTank Heaters ICB Twin Tank HeatersLimit Thermostat Limit ThermostatsTemperature Probe Testing Temperature ProbeCalibration Calibrate Temp ProbeVoltage Selector Switch Test ProcedurePower Switch Test Procedure Removal and ReplacementSchematic Wiring Diagram iTCBA, iTCBB Schematic Wiring Diagram With Factory Sweetener Schematic Wiring Diagram ICB-DV Schematic Wiring Diagram ICB Twin Schematic Wiring Diagram iCBA, iCBB Schematic Wiring Diagram ICB Twin 230V Chassis Ground Term Schematic Wiring Diagram ITB