Electrical System | Section 6 |
|
|
QF2300
Automatic | L1 |
3A. ICE RUN OUT
Ice will build up in the bin until it contacts the bin level probe. After ice contacts the bin level probe for 30 continuous seconds the liquid line solenoid valve, equalization valve and compressor
GROUND |
| C1 | C2 | L2 |
|
|
| ||
|
|
| LIQUID LINE | |
|
| (54) | SOLENOID | (53) |
RELAY |
|
| ||
(91) |
|
|
| |
K2 |
| EQUALIZATION | ||
|
| (58) | SOLENOID | (57) |
| RELAY |
| ||
|
|
|
| |
(25) | K1 |
|
|
|
7 AMP |
| CENTRIFUGAL | (22) | |
|
| SWITCH | ||
FUSE |
| INTERNAL |
|
|
| (65) | OVERLOAD | START |
|
|
|
| ||
|
|
|
| |
| RELAY |
| RUN |
|
RELAY K4 |
|
|
| |
K3 |
|
|
| |
| GEARMOTOR |
| ||
|
|
| ||
| WATER FLOAT |
|
|
|
(52) | VALVE | (56) |
|
|
|
|
| ||
(22) |
|
|
|
|
| (55) |
|
| |
(51) |
|
|
|
|
| DUMP VALVE |
|
|
|
SV2110
|
| 3A. ICE RUN OUT (45 Seconds) |
Toggle Switch | ICE | |
Bin Level Probe | CLOSED ( Ice Contacting probe) | |
Control Board Relays |
| |
#1 | Liquid Line Solenoid Valve | OFF |
#2 | Dump Valve | OFF |
#3 | Gear Motor | ON |
#$ | Water Float Valve Solenoid Coil | ON |
| Revised 8/2003 | Part No. |
|
|