GE Monogram ZDIW50 Preparation, Unpacking the Icemaker, Location, Leveling

Page 11

PREPARATION

Unpacking the Icemaker

1.Lay the carton on rear face and break open the bottom flap.

2.Set the carton upright with all

four flaps outward.

3.Lift carton up and off icemaker.

4.Remove all tape and

packaging material from the outside and inside of the cabinet.

5. Remove the front grille; take

Remove

out the screws securing the

Interior

grille at the bottom and lift it

Packing

free of the cabinet.

 

6.Turn the fan by hand to make certain it moves freely.

Open Bottom Flaps

Location

THIS ICEMAKER MUST BE INSTALLED IN AN AREA PROTECTED FROM THE ELEMENTS, SUCH AS WIND, RAIN, WATER SPRAY OR DRIP.

1.Place the icemaker so the front side will be completely unobstructed to provide proper air flow.

2.The area should be well ventilated with temperature above 55°F. (13°C.) and below 110°F. (43°C.). Best results are obtained between 70°F. (21°C.) and 90°F. (32°C.).

3.Provision for electricity, water and drain connections should be determined.

4.The icemaker may be closed in on the top and three sides, but the front MUST BE unobstructed for air circulation and proper operation. Installation should be such that the cabinet can be moved forward for servicing, if necessary.

Leveling

1.After placing the icemaker into position, check to make certain the icemaker is level side to side and front to back.

2.Accurate leveling is essential for proper operation.

3.The icemaker should be shimmed so that it is solid as well as level. The shims should be of hard permanent type material such as masonite.

4.Compliance with National Sanitation Foundation standards requires that this type of product be sealed to the floor at the bottom rail in order to prevent contamination from spills or the entrance of vermin. Therefore, we recommend that when installing the icemaker you seal it to the floor in accordance with those standards. A silicone-type sealer is recommended.

Thermostat Calibrations

If the icemaker is installed above two thousand feet of altitude, the bin and evaporator thermostats must be adjusted to a warmer setting. Disconnect electricity, remove thermostat and follow the directions for turning the altitude adjustment screw as shown in the label on each thermostat.

(continued next page)

11

Image 11
Contents Monogram.TM Introduction ContentsHelp US Help YOU… If YOU Need ServiceRead All Instructions Before Using This Appliance Important Safety InstructionsHow the Icemaker Works Operating Your IcemakerSetting the Controls Features of Your IcemakerDirty or clogged condenser Care and CleaningCleaning Outside Surfaces Cleaning the CondenserTurn the Cycle Control Knob to OFF Cleaning the Icemaker SystemRemove the hose from the water pump Cleaning the Inside Parts of the IcemakerChanging the Light Bulb Filtering and Treating WaterLeveling PreparationUnpacking the Icemaker LocationTo change the panel Changing the Bin Door PanelChanging the Lower Access Panel Install Custom Door and Access Panels Custom Door and Access PanelsCustom Door and Access Panels-1/4″Thick Custom Door and Access Panels-3/4″ThickTo shut down the icemaker Vacation and MovingRecommended Grounding Methods Free Standing InstallationInstallation Requirements For the InstallerConnect to water. Observe local codes Installation InstructionsDrain Pump QUESTIONS? USE this Problem Solver We’ll Be There Warranty Page Máquina para hacer hielo Contenido IntroducciónSI SE Necesita Servicio Ayudenos a AYUDARLE…Instrucciones DE Seguridad Cómo funciona la máquina para hacer hielo Operacion DE SU Maquina Para Hacer HieloPase Caracteristicas DE SU Maquina Para Hacer HieloAjustando los controles Un condensador sucio o tapado Cuidado Y LimpiezaLimpieza de las superficies exteriores Limpieza del condensadorAgua* y haga girar La perilla de Control De ciclo hasta la Limpieza del sistema de la máquina para hacer hieloVierta 1/2 galón De agua Caliente del grifo En la bandeja paraLimpieza de los componentes interiores Cambio de la bombilla Filtrado y tratamiento del aguaCalibraciones del termostato PreparacionLocalización NivelaciónPara cambiar el panel Cómo cambiar el panel de la puerta del depósitoPuede sufrir un choque eléctrico o lesiones personales Cómo cambiar el panel inferior de accesoPuerta y paneles de acceso a la medida de 3/4″ de espersor Puerta Y Paneles DE Acceso a LA MedidaPuerta y paneles de acceso a la medida de 1/4″ de espesor Vacaciones y mudanzas Métodos que se recomiendan para conectar a tierra Instalacion IndependienteInstrucciones Para LA Instalacion Para el instaladorConexión al agua. Respete los códigos locales Cada instalación es individual pero requeriráContinuación Nivelacion¿ALGUNA PREGUNTA? Consulte Estas Soluciones Estaremos Con Usted Garantia Notas