GE Monogram ZDIW50 Installation Instructions, Connect to water. Observe local codes

Page 17

INSTALLATION INSTRUCTIONS

3/4

1/4O.D. water line compression fitting at water valve

71/2

Right end view 237/8

Water inlet solenoid valve

33/4

Back view 177/8

4long 5/8I.D.

3413/32rubber drain tube—run to

open drain

 

 

 

 

 

 

 

 

 

71/2

 

 

 

 

 

 

 

 

 

 

11/4Min.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9

 

 

 

 

21/2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Hole for field

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

90°

90°

341/29

 

Max.

 

41/2to

 

center line

 

18

Bend field supplied water line to Figure 1 connect to water valve fitting

3/4

supplied water line

 

Figure 2

UTILITIES

OBSERVE LOCAL CODES

Each installation is unique but will require:

A cold water inlet of 1/4″ O.D. soft copper tubing and a shutoff valve.

Either a gravity drain system or a sump pump to lift the water to an existing drain.

An electrical branch circuit of 115 volt, 60 Hz.

1 phase, with a 15 amp delayed action fuse or circuit breaker.

FOR THE PLUMBER

Connect to water. (Observe local codes.)

Use 1/4″ O.D. soft copper tubing for the cold water supply.

Provide a convenient manual shutoff valve in the water line.

Position the tubing so it can enter the access hole located in the right-hand rear of the icemaker cabinet. The tubing should extend beyond the cabinet front so when the icemaker is pushed back in position it will reach the water inlet location in the front. See Figure 1.

NOTE: Always purge the water line before making the final connection to the inlet of the water valve to prevent possible water valve malfunction.

With the icemaker in its permanent location, bend the tubing to meet the connection at the water valve. The garden hose threaded compression fitting is found in the parts bag. This joint provides a convenient disconnect for service. Be sure the tubing is clear of compressor, to prevent rattle.

LEVELING

After placing the icemaker into position, check to make certain the icemaker is level side to side and front to back.

Accurate leveling is essential for proper operation.

The icemaker should be shimmed so that it is solid as well as level. The shims should be of hard permanent type material such as masonite.

Compliance with National Sanitation Foundation standards requires that this type of product be sealed to the floor at the bottom rail in order to prevent contamination from spills or the entrance of vermin. Therefore, we recommend that when installing the icemaker you seal it to the floor in accordance with those standards. A silicone-type sealer is recommended.

ALTERNATE METHOD

If a drain connection directly below the drain tube outlet is not available, install a UL-listed drain pump in the rear compartment of the icemaker.

Drain pump specifications:

UL-listed and have a UL-listed, 120VAC, 3-wire grounded service cord

Overall outside dimensions (maximum):

wide x 6″ deep x 91/2″ high15

Pump flow rate (minimum): 24.0 gph (0.4 gpm) @ 12 feet lift

Operating temperature range 55°F. to 110°F. (13°C. to 43°C.)

(continued next page)

17

Image 17
Contents Monogram.TM Introduction ContentsHelp US Help YOU… If YOU Need ServiceRead All Instructions Before Using This Appliance Important Safety InstructionsHow the Icemaker Works Operating Your IcemakerSetting the Controls Features of Your IcemakerCleaning Outside Surfaces Care and CleaningCleaning the Condenser Dirty or clogged condenserTurn the Cycle Control Knob to OFF Cleaning the Icemaker SystemRemove the hose from the water pump Cleaning the Inside Parts of the IcemakerChanging the Light Bulb Filtering and Treating WaterUnpacking the Icemaker PreparationLocation LevelingTo change the panel Changing the Bin Door PanelChanging the Lower Access Panel Custom Door and Access Panels-1/4″Thick Custom Door and Access PanelsCustom Door and Access Panels-3/4″Thick Install Custom Door and Access PanelsTo shut down the icemaker Vacation and MovingInstallation Requirements Free Standing InstallationFor the Installer Recommended Grounding MethodsConnect to water. Observe local codes Installation InstructionsDrain Pump QUESTIONS? USE this Problem Solver We’ll Be There Warranty Page Máquina para hacer hielo Contenido IntroducciónSI SE Necesita Servicio Ayudenos a AYUDARLE…Instrucciones DE Seguridad Cómo funciona la máquina para hacer hielo Operacion DE SU Maquina Para Hacer HieloPase Caracteristicas DE SU Maquina Para Hacer HieloAjustando los controles Limpieza de las superficies exteriores Cuidado Y LimpiezaLimpieza del condensador Un condensador sucio o tapadoVierta 1/2 galón De agua Limpieza del sistema de la máquina para hacer hieloCaliente del grifo En la bandeja para Agua* y haga girar La perilla de Control De ciclo hasta laLimpieza de los componentes interiores Cambio de la bombilla Filtrado y tratamiento del aguaLocalización PreparacionNivelación Calibraciones del termostatoPara cambiar el panel Cómo cambiar el panel de la puerta del depósitoPuede sufrir un choque eléctrico o lesiones personales Cómo cambiar el panel inferior de accesoPuerta y paneles de acceso a la medida de 3/4″ de espersor Puerta Y Paneles DE Acceso a LA MedidaPuerta y paneles de acceso a la medida de 1/4″ de espesor Vacaciones y mudanzas Instrucciones Para LA Instalacion Instalacion IndependientePara el instalador Métodos que se recomiendan para conectar a tierraConexión al agua. Respete los códigos locales Cada instalación es individual pero requeriráContinuación Nivelacion¿ALGUNA PREGUNTA? Consulte Estas Soluciones Estaremos Con Usted Garantia Notas