PREPARATION OF THE FRAME FOR THE HOOD IN RE-
CYCLING VERSION
In case the hood is used in recycling version it is neces- sary to prepare the frame with all the necessary connec- tion pieces. In order to make the installation easier it is necessary to lengthen the frame:
•Unscrew the two screws 2.1 fixing the upper chim- ney to the frame and pull the chimney out.
•Unscrew the four safety screws placed at the top in the frame separation area. (A).
•Unscrew the eight metric screws connecting the two columns, placed on both sides of the frame (B).
Installation of components in recycling version:
•Fix the recycling air outlet piece 15 to the upper part of the frame using four 12c screws supplied with the
hood.
• Fix the flange (ø 4” 3/4) 10 to the lower part of the | 15 | |
recycling air outlet 15. | ||
|
•Put the reducer flange 9 on the hood body outlet.
•At this point, join the flanges with a pipe. In order to calculate the height of the pipe it is necessary to es- timate the height of the hood and subtract 24” 3/16. (H pipe = H
•Lengthen the frame so that the pipe can be inserted. Place the pipe between the two flanges and block it. Make sure that the height of the frame is correct con- sidering the height of the cooker hood (H frame = H hood – 7” 1/4). Adjust the height of the frame and tighten again the earlier removed screws. Tighten again the safety screws in order to give more stability to the structure.
•Fix the pipe with the pipe clamps 25 supplied with the hood.
Note: The Hood body should be secured to ceiling joists. If necessary, install a wood support behind the dry wall, flush mounted between 2 joists. This will pro- vide the necessary structure and support for mounting.
A
B
12c
10
EN |
| 1 |
| 10 |