Thermador UCVM36FS, UCVM30FS manual

Page 6

Cooktop

8"

2 1/4"

5 1/2"

6 1/2"

22"

Dimensions are dependent on discharge direction.

14"

Integral/Remote

A9-13/16"

B 13"

Be certain to avoid interference with gas and electric supply to cooktop.

Shelving and drawer depths are dependent upon cooktop depth and setback.

Cutout

SB (see

Depth

Fig. 7,8)

 

Cooktop

Drawer

Shelving must

be removable

Fig. 2

F.Investigate potential ductwork routes and choose the shortest possible route from the unit to an outside wall or to the roof via an inside wall and attic. For duidance, typical ducting installations are shown in figures 3 through 6. Installation in island locations will require under floor ducting. Peninsula locations usually require ducting laterally through cabinets or under cabinet toespaces. Consider potential interferences to ductwork from building framing (floor joists, wall studs, etc.) and utilities (electrical wiring, water, gas, or sewer lines, etc).

G. Determine whether the chosen route of ducting will meet vent system performance requirements. To do this, measure the duct lengths needed and determine specific fittings required. Enter this data in the spaces provided in Table 1 (see Page 8). In addition, the duct installation guidelines should be followed in developing the ductwork plan.

H. Purchase the necessary ductwork in accordance with the listing developed in G above.

6

Image 6 Contents
Model UCVM30FS / UCVM36FS Página Safety Instructions Parts Needed Parts Supplied Plan the installation IntroductionGeneral Description Page Figures 3 through 6 are examples of possible ducting Total of both columns= Ductwork Installation Guidelines Ductwork Installation GuidelinesPrepare Countertop Cutout Installation Dimensions with Thermador Cooktop Cooktops Installed with UCVM30FSCooktops Installed with UCVM36FS CCD COD For Installation with Another Brand of Cooktop Figure CW = CCWPrepare Duct Cutouts in Cabinet Prepare Duct Cutouts CabinetInstall Ductwork Remote Blower, If Used Install Electrical ServiceMount Vent and Cooktop Integral Blower VTN600CV2C see Figures 12 for further detail CV2T6 Switch Verify Installation, Operation and Cooktop Alignment Instructions DE Sécurité Pièces nécessaires Pièces fourniesÉtape 1 Plan d’installation Description Générale4 po 16 po Figures 3 à 6 sont des exemples de conduits 10 po Tableau 2 Directives D’INSTALLATION DE Conduits Étape 2 préparation de découpe du plan de travail Po Plaques de cuisson Installation avec UCVM30FS Po Plaques de cuisson Installation avec UCVM36FSInstallation Avec Plaque DE Cuisson Lorsque Spécifié Installation Avec Autres Plaque DE Cuisson OÙ SpécifiéInstallation Avec Autre Marque DE Plaque DE Cuisson figure Étape 3 préparer les découpes de conduits dans l’armoire 30 poÉtape 5 installation de l’électricité Étape 6 installation de l’évent et de la plaque de cuissonMount Integral Blower or Outlet Duct Transition for Remote Soufflerie à distance Interrupteur Retirer la pellicule protectrice du dessus de l’embout Instrucciones DE Seguridad Partes que se necesitan Partes que se incluyenIntroducción Paso 1 Planear la instalaciónDescripción General Asegúrese de evitar la interferncia con el Figuras 3 a 6 son ejemplos de posibles ductos Total de ambas columnas= Tabla 2 Lineamente Para LA Instalación DE Ductos Paso 2 Preparar el recorte en la cubierta Parrillas instaladas con UCVM30FS Parrillas instaladas con UCVM36FSCCD COD Instalación CON Parrilla DE Otra Marca Figura Paso 3 Preparar los recortes para los ductos en el gabinete Paso 4 Instalar el ducto ventilador remoto, si se usa Paso 5 Instalar el servicio eléctricoPaso 6 Montar en ventilador y la parrilla Ventilador interno DHZDHR6 Control DE Page Page Noticias 9000 331
Related manuals
Manual 6 pages 62.53 Kb