7. HORIZONTAL DISCHARGE INSTALLATION (INTERNAL BLOWER(S) ONLY)
Slide the blower to disengage its flange from the retaining bracket.
HD0270 |
Flip the blower and engage its flange in the back wall retaining bracket.
Using a 5/16” socket and the screws previously removed, secure the blower to the hood.
HD0271
LEFT SIDE
MOUNTING
SCREW
LOCATION
RIGHT SIDE |
MOUNTING |
SCREW |
LOCATION |
HD0272 |
Plug the blower in.
NOTE FOR DUAL BLOWER HOOD ONLY: Cut off the plastic tie wrap on left motor cable.
HE0085
8. INSTALL THE ADAPTER AND THE TRANSITION (IF NEED BE)
(INTERNAL BLOWER HOOD ONLY)
Using standard 3/8’’ screws provided, secure the adapter to the top (or back) of the hood (2 screws for a 3¼” x 10” adapter/damper and 4 screws for a 4½” x 18½” adapter). Seal the adapter to the hood using duct tape. For round ducting, install an appropriate sized transition and seal the joints with duct tape.
HJ0013 |
9. INSTALL ANKE60 RECIRCULATION KIT (NON DUCTED INSTALLATION ONLY)
Refer to the installation sheet included with the recirculation kit for details.
- 10 -