8.Remove screws and U-channel from the door. Take the magnet and block assembly from present location and place it at the opposite end of the door channel, with the magnet facing outward from the door.

9.Remove screws. Remove door handle from cam.

10.Apply NEVER-SEEZ high temperature (rated for 250ºC) anti-seize and lubricating compound to the cam and Locktite 242 to screw threads.

11.Turn handle and cam 180-degrees from their original positions and install them on the door with screws. Be sure handle and cam move smoothly.

12.Be sure door handle is in the DOWN position. Turn U-channel 180-degrees from its original position, hold door spring in U-channel open with a screwdriver or similar tool, and install U-channel.

13.Check operation of the cam. Push up on the door handle and check if the spring opens. If the spring does not open, cam and spring are NOT correctly aligned and problem must be corrected.

14.Apply a light amount of Locktite 242 to screws, then install screws.

15.Apply Locktite 242 to the hinge-to-steamer bolts, then install door and hinge mounting bolts. Do NOT tighten mounting bolts at this time.

16.Align door to steamer. Refer to 10.23, Alignment procedure.

IMPORTANT. When the door is reversed, the alternate door switch (installed at time of manufacture) must be connected to the circuit.

17.From the right side access to the upper portion of the steamer, disconnect the two leads of the door switch.

18.In between the upper cavity and the lower cavity, the wires for the alternate door switch may be found. Connect the two wires from the switch to the wiring harness.

19.Close steamer door and operate steamer. If steamer fan does not operate, check location of door magnet and try operation again. If fan operation problem still exists, refer to the Troubleshooting Section of this Manual.

20.Allow steamer to operate for approximately 5 minutes, and then check for leaks. If there are no leaks then steamer is ready for operation. If there are

leaks around the door, recheck door alignment, and if necessary, door gasket installation.

10.26Door Gasket P/N 094147

1.To install, turn off steamer, and allow to cool.

2.Remove the door hinge using one of the following two methods:

a)Support door weight and remove hinge pin, or

b)Support weight of the door and remove the two door-to-hinge bolts.

3.Place the door on a flat, clean, smooth table or similar support. Be careful not to scratch the door

4.Position door on workbench so that its front is lying flat, with handle hanging over edge of bench.

5.Remove inner d12oor panel.

6.Remove and discard gasket.

7.Clean back of the inner door panel. Be sure old sealant is completely removed.

8.Install new door gasket around inner door panel as shown in the illustration. Be sure the inner door panel flange is fully inserted into the door gasket groove.

9.Apply a high temperature silicone sealant, such as GE RTV 180 or equivalent, to the four door spacers.

10.Apply Locktite 242 to the inner door panel mounting screws.

11.Install inner door panel and door gasket on the door spacers, and tighten mounting screws.

12.Align door with hinge and insert hinge pin OR apply Locktite 242 to the door-to-hinge bolts, then install door and mounting bolts. Do NOT tighten mounting bolts at this time.

13.Align door to steamer.

10.27Door Handle, Magnet and Block Assembly

Door Handle

P/N 070123

Magnet & Block

P/N 069762

Screws

P/N 005764

Door Cam

P/N 074252

U-Channel Assy

P/N 094144

Outer Door Panel

P/N 094140

Inner Door Panel

P/N 094141

Door Insulation Bd P/N 094192

OM/SM-HY-6E(CE) 29

Image 29
Contents HY-6ECE Hypersteam Atmospheric Convection Important Read First Important Steam can Cause Burns References Table of ContentsInspection and Unpacking Equipment DescriptionBpst Connection on the right rear side of the steamer Water ConditioningElectrical Supply Connection Installation and Start-UpWater Connections Electrical Supply ConnectionsControls Operating ProcedureOperation 10 OM/SM-HY-6ECE Procedure Outside of Steamer CleaningSuggested Tools OM/SM-HY-6ECESteam Generator and Cooking Chamber If the Service light stays onTroubleshooting MaintenanceExternal Cabinet and Sheet Metal Parts ListKey Description 14 OM/SM-HY-6ECECavity Control Section 16 OM/SM-HY-6ECE Steamer Base SectionSteamer Base Rear View 18 OM/SM-HY-6ECE Steamer Motor and ControlsKey Description New Steamer Generator Individual Parts20 OM/SM-HY-6ECE Steamer Individual PartsAdjustable Legs P/N Service InformationTop Right Side Panel Louvered Removal P/N 10.3 Top/Left Side Removal P/NWater Inlet Valve Three Way P/N To TestWater Inlet Valve Coil Drain Box Spray Nozzle P/NHeater Assembly Complete with High Limit Thermostat To InstallSteam Generator P/N Steam Generator Probes High and Low Water P/N24 OM/SM-HY-6ECE To PrepareElectrical Contactor Timer Assembly Timer Fastener NutControl Voltage Transformer P/N To Install a New Motor Fan Motor Assembly Motor Insulation Motor Shaft Seal 10.17 Fan 26 OM/SM-HY-6ECEMotor Starting Capacitor P/N To Install New CapacitorSteam Generator Ready Thermostat P/N Steam Port GasketDoor Switch P/N Door Removal/Installation/Alignment P/NDoor Reversing Procedures To AlignDoor Gasket P/N Door Handle, Magnet and Block Assembly30 OM/SM-HY-6ECE Door Spring P/NDoor Locking Pin P/N Lock Nut P/N Electrical Schematic 32 OM/SM-HY-6ECE Service LogLimited Warranty To Commercial Purchasers Part Number 128717, REV. B 4/06