Single-Zone and Dual-Zone Sequence of Operation

Testing Defrost Operation using test pins

Defrost Control Board

DFT TST

R and DF2

Warning!

Before removing the access panels to the unit make sure that all power is dis- connected from the unit. Failure to do so could result in injurf or electric shock.

Defrost operation can be initiated us- ing the test pins located on the circuit board of the condensing unit. “Defrost test operation” will be a time compressed ver- sion of the actual defrost cycle.

With the system “off”, using two small alligator clips, jumper the following sets of test pins. “R and DF2” and “DFT TST”.

Defrost control board: Apply power to the indoor and outdoor units. Place the indoor unit in heating mode with the set point temperature well above room tem- perature. This is to ensure that the con- denser will remain on during the entire defrost test operation.

The condenser will operate in heat- ing for approximately 20 seconds. At that point the unit will enter defrost mode for approximately 2 seconds. During this time the condenser fan will switch off, the re- versing valve will energize and the defrost board will energize the indoor electric heat relay through the “W” terminal. After the two second defrost cycle is complete, the unit will switch back to heating opera- tion for another 20 seconds. This process will repeat until the jumpers are removed from the test pins.

Note: If the condenser coil is heavily frosted up with ice, it is likely that the “Defrost Sensor” is already closed. In this case the “R and DFT” jumper can be eliminated. To initiate defrost, mo- mentarily jump pins marked “DFT TST” until the defrost cycle begins. The unit will remain in defrost mode until the condenser coil is defrosted and then it will return to heating mode. When test- ing is complete be sure to remove the jumper(s). DO NOT leave the unit in test mode with jumper(s) in place.

Low ambient operation: If the unit is equipped with low ambient fan control for cooling, the fan will remain off (while in cooling mode) until the condenser pres- sure reaches 210psi. The fan will then en- ergize and run until the condenser pres- sure falls below 150psi. This will happen only in the cooling mode (or when the re- versing valve is energized). In heating (re- versing valve not energized), the fan will run continuous so long as the connection is made between “R” and “Y”.

Side Discharge Condensers

21

www.enviromaster.com

Image 21
Contents Installation, operation and maintenance Manual S1C/S1H Single-Zone & S2C Dual-Zone Condensing Units Installation, operation and maintenance ManualSystem OPTIOns Controls and ComponentsItems for Consideration Installation InstructionsS1C Completed Electrical Connections High Volt ConnectionRefrigerant Piping Installation Instructions Trap Installation Clean the ends of tubing and insert into fittings Refrigerant Processing S2C Refrigerant Charge Table Installation Instructions Refrigerant ProcessingSingle Zone Operation Charts Single Zone Operation Charts Single Zone Operation Charts Single Zone Operation Charts Single Zone Heat Pump Operation Charts Single Zone Heat Pump Operation Charts Dual Zone Operation Charts Single-Zone and Dual-Zone Condenser Sequence of Operation Preperation for Start-UpSingle-Zone and Dual-Zone Sequence of Operation Factory settings 9-24k Btu = 90 minutesWDefrost Control Board S2c specifications and dimensions S1C/S1H Specifications and dimensionsS1C Electrical Specifications S1H Electrical Specifications S2c Test Unit Performance Data Test Unit Performance Data sheetEMI’s Product Line Phone Success Drive Fax Rome, NY