Installation Instructions
REFRIGERANT PIPING
Continued
1.Clean the ends of tubing and insert into fittings.
S2C
S1C
Shown
S1C
Shown
5. Attach manifold set.
manifold | Vaccum Pump Micron Gage |
2.Protect the valves by wrapping with a wet rag "heat sink" before brazing.
S1C
Shown
3.We recommend the use of a shield (can be made from some scrap metal) to protect the paint.
S1C
Shown
Manifold Setup For Evacuation
6.Evacuate line to 500 microns or less to ensure all moisture has been removed and there are no leaks.
| S1C |
| Shown |
| Refer to Refrigerant |
| Charge Table for |
| specified line charge. |
S2C | 7. Once certain of a good evacuation and |
Shown | |
| leak free joints, |
| |
4. Braze tubing into fittings. | factory charge to fill lines and indoor unit. |
Side Discharge Condensers | 9 | www.enviromaster.com |