EMI Volts/HZ/pH manual Refrigerant Piping

Page 7

Installation Instructions

ELECTRICAL WIRING

Continued

10.To replace side panel slide the slotted holes of the panel onto the loosened screws of the front panel so that the edge of the front panel covers the edge of the side panel.

11. Fasten all remaining loose screws.

REFRIGERANT PIPING

Interconnecting Tubing

Specifications

S1

 

MAX.

Max.

 

Liquid

 

Suction

Model

 

Length

Lift

 

Line O.D.

 

Line O.D.

09

 

 

100’

35’

 

1/4"

 

1/2"

12

 

 

100’

35’

 

1/4"

 

1/2"

18

 

 

100’

35’

 

3/8"

 

5/8"

24

 

 

100’

35’

 

3/8"

 

3/4"

30

 

 

100’

35’

 

3/8"

 

3/4"

36

 

 

100’

35’

 

3/8"

 

3/4"

 

 

 

 

 

 

S2C TubING SPECIFICATIONS

 

 

 

Circuit

 

Line Sizes O.D.

 

 

 

 

 

Size

 

Liquid

 

Suction

 

 

 

09, 12

 

1/4”

 

1/2”

 

 

The system will support refriger- ant runs to the inside unit of up to 100' equivalent feet with a 35' rise included. The units are furnished with sweat con- nections and are equipped with refrigerant valves and Schrader fittings for charging and taking pressure readings. The follow- ing precautions should be made:

Be certain no burrs remain on the fittings.

Use only clean refrigeration tubing.

Use tube benders to guard against kinking.

Avoid piping on wet and rainy days and insulate suction line. Be certain that plastic end caps remain in place when inserting through wall openings. Isolate tubing from transmitting vibra- tion to the building or unit and avoid contact with sharp edges. Refrigera- tion valves should be wrapped with a wet rag "heat sink" to protect valves while brazing.

NOTE: It is recommended that a filter drier be installed in liquid line, at the indoor unit on models that a filter drier is not already factory installed (i.e. 18K and larger).

Side Discharge Condensers

7

www.enviromaster.com

Image 7
Contents Installation, operation and maintenance Manual S1C/S1H Single-Zone & S2C Dual-Zone Condensing Units Installation, operation and maintenance ManualSystem OPTIOns Controls and ComponentsItems for Consideration Installation InstructionsS1C Completed Electrical Connections High Volt ConnectionRefrigerant Piping Installation Instructions Trap Installation Clean the ends of tubing and insert into fittings Refrigerant Processing S2C Refrigerant Charge Table Installation Instructions Refrigerant ProcessingSingle Zone Operation Charts Single Zone Operation Charts Single Zone Operation Charts Single Zone Operation Charts Single Zone Heat Pump Operation Charts Single Zone Heat Pump Operation Charts Dual Zone Operation Charts Single-Zone and Dual-Zone Condenser Sequence of Operation Preperation for Start-UpSingle-Zone and Dual-Zone Sequence of Operation Factory settings 9-24k Btu = 90 minutesWDefrost Control Board S2c specifications and dimensions S1C/S1H Specifications and dimensionsS1C Electrical Specifications S1H Electrical Specifications S2c Test Unit Performance Data Test Unit Performance Data sheetEMI’s Product Line Phone Success Drive Fax Rome, NY