EMI Volts/HZ/pH manual Items for Consideration, Installation Instructions

Page 4

System OPTIOns (cont.)

void the warranty. A Field installed low- ambient kit is good for operation down to 32º F. This is accomplished by cycling the condenser fan on and off, which will in turn maintain a constant low side pressure pro- viding a steady cooling effect and keeping the air handler from frosting-up.

Items for Consideration

Locate the unit as close to the indoor section as possible. (see Tubing Specifications chart on pape 7.)

If the unit is used for low ambient cool- ing down to 32°F, this option must be specified to prevent system damage.

Avoid high traffic areas and prevailing wind locations.

Surface must be flat and level.

Mount unit above typical snow fall levels.

Ensure free flow of air through the unit. Air must not recirculate from discharge to intake. Air is drawn through the coil and side discharged through the fan grille. A minimum 48" clearance is necessary for the condenser discharge. Rear intake (coil side) clearance is 12" minimum. Consider how power will be run to the unit from the power source. Refrigerant piping should be a direct line to the indoor unit.

Installation Instructions

SITE PREPARATION

1.Place the unit on a flat concrete surface or pad if on the ground. Roof mounting should use a build up platform to avoid intake of hot air from the roof.

2.In areas of heavy snowfall, condens- ers should be set above the level of maximum anticipated snowfall (12" is usually adequate).

Installation Instructions

Unit Mounting Instructions

S1C is shown

Side discharge unit allows for per- manent mounting through the feet. This is highly recommended due to the vertical design of the unit.

1.Loosen the screws on left and right sides of the front panel. (Do not remove these screws.)

2.Remove the screws on the front of the panel.

3.To remove front panel:

4.Slide front panel forward to clear side screws and remove.

Side Discharge Condensers

4

www.enviromaster.com

Image 4
Contents Installation, operation and maintenance Manual Installation, operation and maintenance Manual S1C/S1H Single-Zone & S2C Dual-Zone Condensing UnitsControls and Components System OPTIOnsInstallation Instructions Items for ConsiderationS1C High Volt Connection Completed Electrical ConnectionsRefrigerant Piping Installation Instructions Trap Installation Clean the ends of tubing and insert into fittings Refrigerant Processing Installation Instructions Refrigerant Processing S2C Refrigerant Charge TableSingle Zone Operation Charts Single Zone Operation Charts Single Zone Operation Charts Single Zone Operation Charts Single Zone Heat Pump Operation Charts Single Zone Heat Pump Operation Charts Dual Zone Operation Charts Preperation for Start-Up Single-Zone and Dual-Zone Condenser Sequence of OperationFactory settings 9-24k Btu = 90 minutesW Single-Zone and Dual-Zone Sequence of OperationDefrost Control Board S1C/S1H Specifications and dimensions S2c specifications and dimensionsS1C Electrical Specifications S1H Electrical Specifications S2c Test Unit Performance Data sheet Test Unit Performance DataEMI’s Product Line Phone Success Drive Fax Rome, NY