EMI Volts/HZ/pH manual High Volt Connection, Completed Electrical Connections

Page 6

Installation Instructions

c. Slide the side panel out to access the high/low electrical connections and wire diagram.

8.Check wiring diagram for the required number of low voltage wires to be run between indoor and outdoor sections.

S1C

High Volt Low Volt

plastic edge guards

Note: Remove the plastic edge guards from the holes and replace with a water- tight strain relief fitting (High V) and a split grommet fitting (low V)

5.Power should be run to a weather proof disconnect box usually within 3 feet of the unit.

6.From the disconnect box, run the power through the 7/8" hole on the side of the unit and into the electrical box and an- chor with the strain relief fitting.

S1C

Shown

Low Volt Connection

9. Connect the 24 volt wiring matching color to color. Refer to the wiring diagram on the inside panel of the condenser, and

a l s orefer to the wiring diagram on the indoor unit. Low volt in- terconnect should be at least 18

awg.

S1C

Shown

High Volt Connection

7.Run wires to the high volt pigtail in the con- trol box and attach L1 and L2 connections. Also run green wire to ground wire.

S1C

Completed Electrical Connections

Side Discharge Condensers

6

www.enviromaster.com

Image 6
Contents Installation, operation and maintenance Manual Installation, operation and maintenance Manual S1C/S1H Single-Zone & S2C Dual-Zone Condensing UnitsControls and Components System OPTIOnsInstallation Instructions Items for ConsiderationS1C High Volt Connection Completed Electrical ConnectionsRefrigerant Piping Installation Instructions Trap Installation Clean the ends of tubing and insert into fittings Refrigerant Processing Installation Instructions Refrigerant Processing S2C Refrigerant Charge TableSingle Zone Operation Charts Single Zone Operation Charts Single Zone Operation Charts Single Zone Operation Charts Single Zone Heat Pump Operation Charts Single Zone Heat Pump Operation Charts Dual Zone Operation Charts Preperation for Start-Up Single-Zone and Dual-Zone Condenser Sequence of OperationFactory settings 9-24k Btu = 90 minutesW Single-Zone and Dual-Zone Sequence of OperationDefrost Control Board S1C/S1H Specifications and dimensions S2c specifications and dimensionsS1C Electrical Specifications S1H Electrical Specifications S2c Test Unit Performance Data sheet Test Unit Performance DataEMI’s Product Line Phone Success Drive Fax Rome, NY