Wayne-Dalton 8850 installation instructions Bottom Section

Page 9

 

 

3

Attaching Bracket Mount Track &

 

Bottom Section

 

 

Tools Needed:

Important: the tops of the vertical

tracks must be level from side

 

None

to side. If the bottom section was

shimmed to level it, the vertical

 

 

track on the shimmed side must be

 

raised the height of the shim.

 

Position the left hand vertical track

 

assembly over the rollers of the bottom

 

section. Make sure the counterbalance

 

cable is located between the rollers and

 

the door jamb. Drill 3/16” pilot holes into

 

the door jamb for the lag screws.

 

Loosely fasten vertical track assembly

 

to the jamb using 5/16” x 1-5/8” lag

 

screws. Tighten the bottom lag screw to

 

jamb, to maintain 3/8” to 5/8” spacing as

 

shown between the bottom section and

 

vertical track. The other lag screws will be

 

tightened in step, Top Section.

 

Repeat for other side.

 

Stack the bottom section into position by

 

hooking the left hand roller into the left

 

hand vertical track, as shown in FIG. 1.

 

NOTE: Adjust the spacing of the vertical

 

tracks from 3/8” - 5/8” spacing at the

 

bottom section and 1-11/16” to 1-3/4”

 

spacing at the top section.

 

NOTE: Hang the counterbalance cables

 

over the top of the flagangles as shown.

Wood Jamb

fIG 1

Counterbalance

Cable

Fig 1

Stack the section into position, by hooking the left hand roller into the vertical track and repeating for the right hand side.

INSTALLATION

9

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your

local yellow pages/business listings or go to the Find a Dealer section online at www.wayne-dalton.com

Image 9
Contents Aluminum Full View Table of Contents Package Contents Door Section Identification Package ContentsP1 Removing An Old Door Tools RequiredSecurely attach a Preparing the OpeningFailure to Suitable mounting pad to structurallyConsult your Wayne-Dalton representative Tools Needed InstallationTo Bottom Brackets Bottom Section Hinges Installing Bottom SectionSection Inch track Stacking SectionsLift Handle Top BracketTop Section Step PlateFlagangle Adjusting Top BracketsCenter Bearing Bracket Torsion End Bearing BracketsTorsion Spring Assembly Attaching Torsion Springs to Center Bearing Bracket Counterbalance Cables Securing DoorFor Spring Winding Winding Torsion Springs Keep horizontal track Rear SupportParallel and within 3/4 Maximum of door edge Otherwise door could fallThird roller. Insert a winding bar into Tools Needed To adjust spring tension, fully closeSet screws in the winding cone AgencyPull Rope Side LockTrolley Operator Or a double wide bottom rail Exhaust Port InstallationBoth sides of the door section Outside Trim Ring #10 Hex Nuts GasketCleaning Your Garage Door CleaningLimited Warranty Model Thank you for your purchase