7 | Top Bracket | |
| ||
Tools Needed: | Align | |
with vertical groove on the end stile and | ||
| ||
Power Drill | ensure top bracket is level and aligned | |
| with edge of top section. Secure with | |
7/16” Socket | (4) 1/4”- 20 x 7/8” self drilling screws, | |
one in each corner of the top bracket, as | ||
Driver | ||
shown. Loosely fasten top bracket slide | ||
| ||
| with (1) 5/16” - 18 x 3/4” carriage bolt | |
| and 5/16” - 18 hex nut. Insert roller into | |
| slide. Repeat for other side. | |
| If your door has double end stiles then it | |
| will require 4 top brackets; as shown, in | |
| which case an additional top bracket will | |
| be installed in the same manner next to | |
| the first top bracket with one roller being | |
| placed through both top bracket slides. | |
| Four reinforcement brackets will then be | |
| installed under the 4 top brackets and | |
| secured to the section with (4) 1/4”- 20 X |
top bracket | top section |
base |
|
(4) 1/4”- 20 x 7/8” self drilling screws
end stile
| (1) 5/16” - 18 x 3/4” | |
|
| carriage bolt |
| top | top section |
|
| |
| bracket | |
| slide |
|
5/16” - 18 | top |
|
bracket |
| |
hex nut |
| |
base |
| |
|
|
7/8” self drilling screws. |
NOTE: If your door is trolley operated; it |
is recommended that an optional strut be |
installed on the top rail. |
Now stack the top section. Take care to |
ensure it is aligned properly with the other |
sections. |
top section
(16)1/4”- 20 x 7/8” self drilling
screws
(4) 1/4”- 20 x 7/8”
self drilling
screws
(4)Reinforcement Brackets
8 | Lift Handle |
| Lock |
|
|
|
|
| Section |
|
|
Tools Needed: | Bottom section |
| Lift |
|
|
Locate the center most stile of the bottom section of the door. |
| handle |
|
| |
Tape Measure | On the inside of the door, center the lift handle vertically with |
|
|
| Lock |
the center stile; horizontally on the bottom section rail, and |
|
|
| ||
|
|
|
| Section | |
| within 8” of the bottom of the section. |
|
|
| |
Pencil |
|
|
|
| |
Use the lift handle as a template, place a mark at each hole |
|
|
|
| |
| location onto the bottom section rail. Drill a 9/32” diameter |
| (2) 1/4” - 20 | Lift |
|
Power Drill | hole through the section at each marked location. |
|
| ||
| x 5/8” self |
| |||
| handle |
| |||
| NOTE: Be extremely careful to keep drill straight. |
| drilling screws |
| |
|
|
|
| ||
9/32” Drill Bit | Assemble the outside and inside lift handle to the section | bottom |
|
| bottom |
| using (4) 1/4” | Section |
|
| Section |
1/4” Wrench | Lock (2nd) section |
| lift handle outside |
| |
|
|
| |||
| Position the lift handle’s bottom hole 4” from the bottom of |
|
|
| Lock |
| the lock (2nd) section. Vertically align with the lift handle on |
| Lock |
| |
|
|
| Section | ||
| the bottom section. Using the lift handle as a template, place |
| Section |
| |
|
|
|
| ||
| mark at each hole location onto the center stile. Drill a 9/32” |
| (2) 1/4” - 20 |
|
|
| diameter through the section at each marked location. |
|
|
| |
| NOTE: Be extremely careful to keep drill straight. |
| x 5/8” self |
|
|
| Assemble the outside and inside lift handle to the section |
| drilling |
|
|
|
| screws |
|
| |
| using (4) 1/4” | Lift |
| Lift |
|
|
|
|
| ||
| WARNING |
| handle |
| |
| handle |
|
| ||
|
|
|
| ||
|
|
|
|
| |
| TO AVOID POSSIBLE INJURY, LIFT HANDLES THAT ARE |
|
|
|
|
| INSTALLED WITHIN 4 INCHES OF A SECTION INTERFACE |
|
|
|
|
| SHALL PROMOTE VERTICAL ORIENTATION OF THE HAND. |
|
|
| bottom |
|
|
| bottom Section |
| Section |
|
|
| lift handle inside |
| |
12 |
|
|
|
| 12 |
Please Do Not Return This Product To The Store. Contact your local
local yellow pages/business listings or go to the Find a Dealer section online at