Jacuzzi 2 Wall and 3 Wall manual Wall TOWER, Fixed Wall and Curved Glass Installation

Page 10

2 WALL: TOWER, FIXED WALL AND CURVED GLASS INSTALLATION

STEP 1

Position the wall posts so the edge of the post is set back 3/4" (19 mm) in from the edge of the base

STEP 3A

Slide straight glass panel all the way into wall post. Mark position of glass post. Remove panel.

3/4"

(19 mm)

FINISH WALL

EDGE OF BASE

STEP 2

Level both wall posts in their proper position and mark where screw holes are to be drilled. Drill 3/16" holes and secure with wall anchors and screws provided. Cut a 12" strip of tape (provided) and apply firmly over screw heads.

TAPE

6 PLACES)

MARK POSITION

STEP 3B

Apply a bead of silicone sealant on underside of bottom bracket corner post and place bracket where marked. Drill pilot holes (#8 screw) and secure bracket to base. Reinsert panel into wall post and position glass post over bracket.

APPLY BEAD OF

SILICONE SEALANT

ON UNDERSIDE OF

BOTTOM BRACKET

CORNER POST

8

Image 10
Contents Summer Rain Wall & 3 Wall WALK-IN Shower Systems Important Safety Information Contents Save These Instructions for Future UseWall Specifications Total Weight Floor LoadingWall ROUGH-IN Reference Wall Component Identification Wall Base Installation StepIncorrect CLEAN-UP After Installation Wall TOWER, Fixed Wall and Curved Glass Installation Notch Adjust the rails until tower is vertical in 2 planes Cover CAP Step 140 lb 64 kg Wall ROUGH-IN Reference Wall Component Identification 5x5 Opening MIN. AS Possible Incorrect Cement Board Stud Silicone Sealant Minimum GAP Wall Tower and Curved Glass Installation Tower Support Rail Front Rail Secure the rails Install cover cap on wall post Step Wall Operation Body Sprays 2 Upper & 2 LowerWall Maintenance Authorized ServiceTower Fixtures Repair Parts Tower Assembly Washer Part of D709827Tower Plumbing Repair Parts Wall Unit Repair Parts Wall Unit Repair Parts Jacuzzi Whirlpool Bath Responsibilities of Others