3 WALL BASE INSTALLATION

PRELIMINARY ROUGH-IN

The floor structure beneath the unit must be able to support a total weight of the unit and bather. Refer to the table under total weight.

STEP 1

Provide an opening in the subfloor no less than 5" x 5" square. This opening should be located on the center lines of the shower base drain hole (See Product Chart). The opening is to accommodate a 2" waste pipe. The waste pipe should be 1/4" to 1/2" above the surface of the subfloor.

90°

90°

2" WASTE PIPE

5"x5" OPENING (MIN. AS POSSIBLE)

INSTALLATION INSTRUCTIONS

STEP 2

Remove the stainless steel strainer from the drain assembly. Disassemble the locknut and two gaskets from the back of the drain assembly. Apply a 1/4" bead of caulking (silicone) to the drain hole and insert the drain assembly. Replace the rubber washer, fiber washer, and lock nut in that order. Hand tighten the locknut. Remove excess sealant from finished side.

Apply a lubricant (common household liquid soap works well) to the inside of the rubber seal of the drain assembly.

STRAINER

APPLY LUBRICANT

SILICONE

DRAINSEALANT ASSEMBLY

SHOWER BASE

RUBBER WASHER

As shown in top view, 1/2" copper pipes are provided to connect to the water supply. Also provided are 2 loose 45° elbows as shown for installation in Detail 1.

FIBER WASHER

STEP 3

NUT

CAUTION: A nonflammable protective barrier must be placed between soldering work and base unit to prevent damage to the base.

When connecting the supply lines, the toe plate can be notched to accommodate the pipes.

The pipe under the base can be cut to length. To do so, remove the pipe clamps under the base, cut the pipe and reinstall pipes.

STUD

WALL

NOT PROVIDED

45° ELBOW PROVIDED (2)

DEATAIL 1

If the subfloor is level, no other preparation is neces- sary. You can proceed to install the shower base. If the subfloor is not level, level shower base by spreading floor leveling compound, mortar, plaster or minimal expansion structural foam with a minimum density of 5 lbs./cubic feet EVENLY over ENTIRE area where base will be installed. The compound used MUST make contact with the entire bottom surface of the base. Both sides of a joint or splice of subfloor should be level to each other. Level and support waste pipe cutout area greater than 5" x 5". The base is NOT to be supported by the tile flange.

SPREAD MORTAR OR LEVELING COMPOUND ETC. EVENLY OVER ENTIRE AREA

16

Image 18
Contents Summer Rain Wall & 3 Wall WALK-IN Shower Systems Important Safety Information Contents Save These Instructions for Future UseWall Specifications Total Weight Floor LoadingWall ROUGH-IN Reference Wall Component Identification Wall Base Installation StepIncorrect CLEAN-UP After Installation Wall TOWER, Fixed Wall and Curved Glass Installation Notch Adjust the rails until tower is vertical in 2 planes Cover CAP Step 140 lb 64 kg Wall ROUGH-IN Reference Wall Component Identification 5x5 Opening MIN. AS Possible Incorrect Cement Board Stud Silicone Sealant Minimum GAP Wall Tower and Curved Glass Installation Tower Support Rail Front Rail Secure the rails Install cover cap on wall post Step Wall Operation Body Sprays 2 Upper & 2 LowerWall Maintenance Authorized ServiceTower Fixtures Repair Parts Tower Assembly Washer Part of D709827Tower Plumbing Repair Parts Wall Unit Repair Parts Wall Unit Repair Parts Jacuzzi Whirlpool Bath Responsibilities of Others