Jacuzzi 2 Wall and 3 Wall manual Tower Plumbing Repair Parts

Page 28

TOWER PLUMBING REPAIR PARTS

1.A944000 (9X) Spring Clamp, .625 OD Hose

2.U405000 L=31.0" Tubing, PVC Reinforced, 10mm Barb

3.U405000 L=5.5" Tubing, PVC Reinforced, 10mm Barb

4.A945000 (7X) Spring Clip, .75 OD Hose

5.U400000 FTG, Straight, 1/2" FTS X 10mm Barb

6.U403000 (2X) Cap, 1/2" FST

7.U711000 (2X) Strainer Washer, 1/2" Dia.

8.U405000 L=31.0" Tubing, PVC Reinforced, 10mm Barb

9.U540000 (2X) 1/2" Flexhose 38", Female Swivel Heads

10.GASKET (2X) Gaskets Supplied with Hose

11.U827000 (2X) Ball Valve, .5 FTP X .5 MPT L

12.U421000 (11X) Washer, FTG .7 OD

13.U401000 (7X) FTG, Ell, 1/2" FST X 10mm Barb

14.U405000 L=4.5" Tubing, PVC Reinforced, 10mm Barb

15.U404000 (2X) FTG, Y, 10mm X 10mm X 10mm Barb

16.U405000 L=2.5" Tubing, PVC Reinforced, 10mm Barb

17.U402000 FTG, Tee, 1/2" FST X 10mm Barb

18.U405000 L=10.0" Tubing, PVC Reinforced, 10mm Barb

19.U405000 L=4.5" Tubing, PVC Reinforced, 10mm Barb

20.U405000 L=5.5" Tubing, PVC Reinforced, 10mm Barb

Note 1: For Clamping U405000 to U401000 or U402000.

Note 2: For Clmping U405000 to U400000 or U404000.

1 (9X)

 

 

See Note 1

 

 

2

 

 

 

12

(11X)

 

13

(7X)

3

 

 

 

14

 

4 (7X)

15

(2X)

See Note 2

 

 

5

16

 

 

17

 

 

18

 

6

 

 

7

 

 

 

19

 

8

 

 

9 (2X)

 

 

 

20

 

10 (2X)

 

 

11

 

 

26

Image 28
Contents Summer Rain Wall & 3 Wall WALK-IN Shower Systems Important Safety Information Contents Save These Instructions for Future UseWall Specifications Total Weight Floor LoadingWall ROUGH-IN Reference Wall Component Identification Wall Base Installation StepIncorrect CLEAN-UP After Installation Wall TOWER, Fixed Wall and Curved Glass Installation Notch Adjust the rails until tower is vertical in 2 planes Cover CAP Step 140 lb 64 kg Wall ROUGH-IN Reference Wall Component Identification 5x5 Opening MIN. AS Possible Incorrect Cement Board Stud Silicone Sealant Minimum GAP Wall Tower and Curved Glass Installation Tower Support Rail Front Rail Secure the rails Install cover cap on wall post Step Wall Operation Body Sprays 2 Upper & 2 LowerWall Maintenance Authorized ServiceTower Fixtures Repair Parts Tower Assembly Washer Part of D709827Tower Plumbing Repair Parts Wall Unit Repair Parts Wall Unit Repair Parts Jacuzzi Whirlpool Bath Responsibilities of Others