Jacuzzi 2 Wall and 3 Wall manual Secure the rails Install cover cap on wall post

Page 23

3 WALL: TOWER AND CURVED GLASS INSTALLATION

STEP 9

STEP 11

Secure the rails.

Install cover cap on wall post.

COVER CAP

STEP 10

Tighten the tower base bolt. Two shut-off valves are provided. To hook up supply lines, unscrew valves from braided line. Using thread sealant, screw valve to stub outs at bottom of tower. Then reconnect braided line using provided gasket. Do not twist or kink supply lines when connecting.

STEP 12

Install glazing gasket on curved glass wall post on the outside. Note orientation of gasket. Soapy water may help to insert the glazing gasket. On the inside of enclosure, apply sealant the entire length of glass and wall post as well as the entire length of glass and tower.

COLD

SHUT OFF

 

VALVES

 

(PROVIDED)

GLASS

WALL POST

INSIDE OF

ENCLOSURE

HOT

 

BOLT

 

GLAZING GASKET

APPLY SEALANT

 

GLAZING

GASKET

TOWER TOP PLATE

APPLY

SEALANTINSIDE OF

ENCLOSURE

21

Image 23
Contents Summer Rain Wall & 3 Wall WALK-IN Shower Systems Important Safety Information Save These Instructions for Future Use ContentsTotal Weight Floor Loading Wall SpecificationsWall ROUGH-IN Reference Wall Component Identification Step Wall Base InstallationIncorrect CLEAN-UP After Installation Wall TOWER, Fixed Wall and Curved Glass Installation Notch Adjust the rails until tower is vertical in 2 planes Cover CAP Step 140 lb 64 kg Wall ROUGH-IN Reference Wall Component Identification 5x5 Opening MIN. AS Possible Incorrect Cement Board Stud Silicone Sealant Minimum GAP Wall Tower and Curved Glass Installation Tower Support Rail Front Rail Secure the rails Install cover cap on wall post Step Body Sprays 2 Upper & 2 Lower Wall OperationAuthorized Service Wall MaintenanceTower Assembly Washer Part of D709827 Tower Fixtures Repair PartsTower Plumbing Repair Parts Wall Unit Repair Parts Wall Unit Repair Parts Jacuzzi Whirlpool Bath Responsibilities of Others