Jacuzzi 2 Wall and 3 Wall manual Step

Page 24

3 WALL: TOWER AND CURVED GLASS INSTALLATION

STEP 13

Turn on water supply and check for leaks. Correct any leaks before installing tower cover.

STEP 14

Install tower cover as shown. Insert cover at top first.

TOWER TOP PLATE

TOWER COVER

INSERT THIS SIDE FIRST

TOWER COVER

STEP 15

Seal all around the base of tower with silicone sealant. Also seal the inside of both wall posts, bottom of both glass panels on the inside only.

APPLY SEALANT

ALONG BASE

OF GLASS

APPLY SEALANT

APPLY SEALANT

ALL AROUND

ALONG BASE

TOWER BASE

AND SIDE OF

 

WALL POST

(RAILS NOT SHOWN)

TOP VIEW

 

22

Image 24
Contents Summer Rain Wall & 3 Wall WALK-IN Shower Systems Important Safety Information Contents Save These Instructions for Future UseWall Specifications Total Weight Floor LoadingWall ROUGH-IN Reference Wall Component Identification Wall Base Installation StepIncorrect CLEAN-UP After Installation Wall TOWER, Fixed Wall and Curved Glass Installation Notch Adjust the rails until tower is vertical in 2 planes Cover CAP Step 140 lb 64 kg Wall ROUGH-IN Reference Wall Component Identification 5x5 Opening MIN. AS Possible Incorrect Cement Board Stud Silicone Sealant Minimum GAP Wall Tower and Curved Glass Installation Tower Support Rail Front Rail Secure the rails Install cover cap on wall post Step Wall Operation Body Sprays 2 Upper & 2 LowerWall Maintenance Authorized ServiceTower Fixtures Repair Parts Tower Assembly Washer Part of D709827Tower Plumbing Repair Parts Wall Unit Repair Parts Wall Unit Repair Parts Jacuzzi Whirlpool Bath Responsibilities of Others