Jacuzzi 2 Wall and 3 Wall manual Adjust the rails until tower is vertical in 2 planes

Page 12

2 WALL: TOWER, FIXED WALL AND CURVED GLASS INSTALLATION

STEP 9

Place the front rail and tower support rail against the walls. Check level and mark the position for the rail mounting bracket. The screw position will be above the rail. Drill the wall with a 3/16" bit and secure bracket with screws and wall anchors provided.￿

ATTACH RAIL

BRACKET TO WALL

SECURE RAIL TO

BRACKET (TURN CW

TO TIGHTEN)

MOVE COVER CAP

OVER BRACKET

STEP 10

Adjust the rails until tower is vertical in 2 planes.

STEP 11

Secure the rails.

STEP 12

Tighten the tower base bolt. Two shut-off valves are provided. To hook up supply lines, unscrew valves from braided line. Using thread sealant, screw valve to stub outs at bottom of tower. Then reconnect braided line using provided gasket. Do not twist or kink supply lines when connecting.

SHUT OFF VALVES (PROVIDED)

COLD

BOLT

HOT

10

Image 12
Contents Summer Rain Wall & 3 Wall WALK-IN Shower Systems Important Safety Information Contents Save These Instructions for Future UseWall Specifications Total Weight Floor LoadingWall ROUGH-IN Reference Wall Component Identification Wall Base Installation StepIncorrect CLEAN-UP After Installation Wall TOWER, Fixed Wall and Curved Glass Installation Notch Adjust the rails until tower is vertical in 2 planes Cover CAP Step 140 lb 64 kg Wall ROUGH-IN Reference Wall Component Identification 5x5 Opening MIN. AS Possible Incorrect Cement Board Stud Silicone Sealant Minimum GAP Wall Tower and Curved Glass Installation Tower Support Rail Front Rail Secure the rails Install cover cap on wall post Step Wall Operation Body Sprays 2 Upper & 2 LowerWall Maintenance Authorized ServiceTower Fixtures Repair Parts Tower Assembly Washer Part of D709827Tower Plumbing Repair Parts Wall Unit Repair Parts Wall Unit Repair Parts Jacuzzi Whirlpool Bath Responsibilities of Others