2 WALL: TOWER, FIXED WALL AND CURVED GLASS INSTALLATION
STEP 16
Turn on water supply and check for leaks. Correct any leaks before installing tower cover.
STEP 17
Install tower cover as shown. Insert cover at top first.
TOWER TOP PLATE
TOWER COVER
INSERT THIS SIDE FIRST
TOWER COVER
STEP 18
Seal all around the base of tower with silicone sealant. Also seal the inside of both wall posts, glass post and the bottom of both glass panels on the inside only.
APPLY SEALANT |
|
| ||
ALONG BASE |
|
| ||
AND SIDE OF |
|
| ||
WALL POST |
|
|
| |
APPLY SEALANT |
|
| ||
ALONG BASE | APPLY SEALANT | |||
OF GLASS |
| |||
| ALONG BASE | |||
|
| |||
|
| OF GLASS | ||
APPLY SEALANT | APPLY SEALANT | APPLY SEALANT | ||
AROUND | ALL AROUND | ALONG BASE | ||
GLASS POST | ||||
TOWER BASE | AND SIDE OF | |||
| ||||
|
|
| WALL POST | |
(RAILS NOT SHOWN) | ||||
| TOP VIEW |
|
12