3.5RETRANSFER AND SHUTDOWN

When utility power source voltage has been restored, electrical loads may be transferred back to that source and the generator can be shut down as fol- lows:

Verify that utility power supply voltage to the trans- fer switch has been positively turned Off, using whatever means provided (such as utility main line circuit breaker).

Set the generator’s main circuit breaker to its OFF or OPEN position.

Let the generator engine run at no-load for a few minutes, to stabilize internal unit temperatures.

On the generator console, set the AUTO/OFF/ MANUAL switch to OFF. Wait for engine to come to a complete stop.

For transfer to utility position, refer to the Owner’s Manual of the particular transfer switch.

Turn on the utility power supply to the transfer switch, using whatever means provided (such as a utility main line circuit breaker). The utility power source now powers the loads.

Section 3 - Operation

Guardian 40kW Liquid-cooled Generators

If DC power to the control board is lost, the weekly exercise setting will be lost. This is indicated by all five red LEDs continually flashing. In this state the generator will still start and run in manual mode, or automatically start and run if UTILITY is lost while in AUTO mode, but it will not perform a weekly exercise cycle.

If a failure occurs while running in this mode, the five red LEDs will stop flashing, the individual fault LED will turn on and the engine will shut down. Once the AUTO/OFF/MANUAL switch has been switch to OFF, the individual fault LED will turn OFF and the five red LEDs will begin flashing to show exercise has still not been set.

Figure 3.2 - “Set Exercise Time” Switch

 

 

S

 

 

 

S

 

FUSE

F

U

F

 

F

U

F

 

S

 

 

S

E

 

E

 

 

 

 

FUSE

 

 

U

4A

 

S

E

 

S

E

 

U

 

15A

 

U F

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BAT.MAIN

CHARGER

3.6AUTOMATIC OPERATION

To set the system for fully automatic operation, pro- ceed as follows:

Check that load circuits are connected to the utility power supply.

Set the AUTO/OFF/MANUAL switch to its AUTO position.

Set the generator main circuit breaker to its ON or Closed position.

3.7WEEKLY EXERCISE CYCLE

The engine control board will start and run the gen- erator once every seven days for approximately 12 minutes. If utility should fail during this exercise period, the engine control board will transfer the load to the generator output and continue to run until util- ity returns.

On the day, and at the time of day chosen for the gen- erator to exercise, set the weekly exercise cycle as fol- lows:

1.Place the AUTO/OFF/MANUAL switch in the AUTO position.

2.Press and hold the “Set Exercise” switch for three seconds, then release.

At this time all five red LEDs will flash for approxi- mately 10 seconds, then the engine will start and run for it’s 12 minute exercise period, then shut down. The generator will now start and run each week at the same time.

 

AUTO

OFF

 

 

OFF

ON

 

SET

MANUAL

EXERCISE

 

TIME

 

Generac® Power Systems, Inc. 15

Image 17
Contents Liquid-cooled, Prepackaged Standby Generators ‹ HOW to Obtain Service ‹ Operation and MaintenanceIntroduction ‹ Read this Manual ThoroughlyTable of Contents General Hazards Electrical Hazards Generator Transfer SwitchAutomatic System Operation Generator AC Connection Systems‹ 1.7.2 High Coolant Temperature Switch ‹ 1.7.1 LOW OIL Pressure Switch‹ 1.7.3 LOW Coolant Level Switch Generator Fuel SystemLifting the Generator UnpackingReconfiguring the Fuel System Specifications‹ 1.10.1 Generator Specifications ‹ 1.10.2 Engine SpecificationsBefore Installation Torque SpecificationsEngine OIL Recommendations Coolant RecommendationsGenerator Mounting Support Generator LocationBasic Standby Electric System ‹ 2.1.1 Nfpa StandardsGenerator AC Neutral Connections Emergency Circuit Isolation MethodTotal Circuit Isolation Method Battery Installation Transfer Switch Signal Connections‹ 2.9.1 PRE-PACKAGED ATS ‹ 2.9.2 GTS-TYPE ATSPreparation Before START-UP ‹ 3.2.1 AUTO/OFF/MANUAL Switch Using AN Engineered GTS Transfer Switch‹ 3.2.2 Fault Indicator Leds Control Console Components‹ 3.2.5 SET Exercise Time Switch Engine Governor AdjustmentsManual Transfer START-UP ‹ 3.2.6 System Ready LEDWeekly Exercise Cycle Automatic OperationCooling System Overload Protection for Engine DC Electrical SystemChecking Fluid Levels ‹ 4.5.8 Check FAN Belt ‹ 4.5.2 Check Battery‹ 4.5.9 Inspect Engine Governor ‹ 4.5.1 Check Engine OIL Level‹ 4.6.1 Cleaning the Generator Miscellaneous Maintenance‹ 4.5.11 Changing the Engine AIR Cleaner ‹ 4.5.13 Coolant Change‹ 4.6.4 Battery Replacement ‹ 4.6.3 Battery MaintenanceService Maintenance Interval Information Scheduled MaintenanceLevel Maintenance Level Problem Cause Correction Troubleshooting PointsElectrical Data Electrical Data Electrical Data Electrical Data Carrier Rear Bearing Hold Down Battery Assy WireBoot Battery Cable Battery Post Covwer BlackSee Latch Detail Assembly BASE-DOOR Ground Wire Assy GRD Wire 99HSBIntake Duct HSB Duct Discharge RH FrontGenerac Power Systems, Inc Control BOX HSB Assy 2A 12V UL BatteryCover Front Panel HSB Cover TOP Panel HSBGenerac Power Systems, Inc ASSEMBLY, Resistor COVER, Flywheel AccessFlexplate 3.9L HSB MACHINING, 3.9L EnginePump Radiator Copper Brass Tank Coolant RecoveryVENTURI,3.9L Cryslr HSB 22FAN Radiator Support L/H SideTo Engine Hold Down AIR Cleaner Base AIR Cleaner PlatePlate AIR Cleaner TOP Flange Fuel InletLeads Rotor 390 40KW 1P Direct HSB Rotor 390 30KW 1P Direct HSBSTR-390--40AD HSB 433MM LONG3.9L Chrysler Rear Bearing Carrier 390/DRCTOUT NUT TOP Lock FL M12-1.75WYE, Pipe 3.9L Chrysler Exhaust Flange 2 PipeInstallation Diagram Guardian 40kW Liquid-cooled Generators Guardian 40kW Liquid-cooled Generators This Warranty Shall not Apply to the Following