Section 4 — Maintenance
Guardian 40kW
4.7SCHEDULED MAINTENANCE
Following is a recommended maintenance schedule for Generac small standby and residential generator sets. The established intervals in the schedule are the maximum recommended when the unit is used in an average service application. They will need to be decreased (performed more frequently) if the unit is used in a severe application. Use calendar time from the previous maintenance interval to determine the next required maintenance interval.
Service Maintenance Interval Information:
The various service maintenance intervals are designated by interval numbers as follows:
1An early inspection of the generator set to ensure it is ready to operate when required and to identify any poten- tial problem areas.
Performed monthly, this inspectin requires approximately .5
This inspection may be performed by the end user providing the following safety steps are taken to prevent the engine from starting automatically without warning:
To prevent injury, perform the following steps in the order indicated before starting any maintenance:
•Disable the generator set from starting and/or connecting to the load by setting the control panel
•Remove the control panel fuse.
•Turn off the battery charger.
•Remove the negative battery cable.
The battery charger must be turned off BEFORE removing the battery cable to prevent an over current condi- tion from burning out sensitive control panel components and circuits.
Following all maintenance, reverse these steps to insure the unit is returned to standby setup for normal operation when required.
2A
Performed ONLY ONCE following the first three months or the first 30 hours of operation after purchase of the unit and requires approximately 2.5
This inspection contains some maintenance tasks which require special tools, equipment, and/or knowledge to accomplish and should be performed only by an authorized service dealer.
3An operational inspection of the generator set to ensure it is ready to operate and carry the load when required, and to identify any potential problem areas.
Performed
This inspection contains some maintenance tasks which require special tools, equipment, and/or knowledge to accomplish and should be performed only by an authorized service dealer.
4A
Performed annually or following each 100 hours of operation of the unit and requires approximately 4.0
This inspection contains some maintenance tasks which require special tools, equipment, and/or knowledge to accomplish and should be performed only by an authorized service dealer.