Generac Power Systems 04389-1, 04456-1, 04390-1 owner manual Sequence of Automatic Operation

Page 17

Section 3 — Operation

Guardian Air-cooled 7 kW, 12 kW and 15 kW Generators

3.4SEQUENCE OF AUTOMATIC

OPERATION

The generator’s control panel houses a control logic circuit board. This board constantly monitors utility power source voltage. Should that voltage drop below a preset level, circuit board action will signal the engine to crank and start. After the engine starts, the circuit board signals the transfer switch to activate and connect load circuits to the standby power sup- ply (load terminal lugs T1/T2 connect to terminal lugs E1/E2).

Upon restoration of utility source voltage above a pre- set level, generator circuit board action signals the transfer switch to transfer loads back to that power supply. After retransfer, the engine is signalled to shut down.

The actual sequence of operation is controlled by sensors and timers on a control logic circuit board, as follows:

A.Utility Voltage Dropout Sensor

This sensor monitors utility source voltage.

If utility source voltage drops below about 70 per- cent of the nominal supply voltage, the sensor energizes a 15-second timer.

Once the timer has expired, the engine will crank and start.

B.Engine Warm-up Time Delay

This mechanism lets the engine warm up for about 10 seconds before the load is transferred to the standby source.

C.Standby Voltage Sensor

This sensor monitors generator AC output volt- age. When the voltage has reached 50 percent of the nominal rated voltage, transfer to standby can occur.

D.Utility Voltage Pickup Sensor

This sensor monitors utility power supply volt- age. When that voltage is restored above 70 per- cent of the nominal source voltage, a retransfer time delay starts timing.

E.Retransfer Time Delay

This timer runs for about 15 seconds.

At end of a 15-second delay, circuit board action de-energizes transfer relay in the transfer switch.

Retransfer to utility power source then occurs.

F.Engine Cool-down Timer

When the load is transferred back to utility power source, the engine cool-down timer starts timing.

The timer will run for about one minute, and the generator will then shut down.

3.5MANUAL TRANSFER OPERATION

‹3.5.1 TRANSFER TO GENERATOR POWER SOURCE

To start the generator and activate the transfer switch manually, proceed as follows:

1.Set the generator’s Auto/Off/Manual switch to OFF.

2.Set the generator’s main circuit breaker to its OFF (or open) position.

3.Turn OFF the utility power supply to the transfer switch using the means provided (such as a utility main line circuit breaker).

DANGER

Do not attempt to activate the transfer switch manually until all power voltage supplies to the switch have been positively turned off. Failure to turn off all power voltage supplies may result in extremely hazardous and possibly fatal electrical shock.

4.Use the manual transfer handle inside the trans- fer switch to move the main contacts to their “Standby” position, i.e., loads connected to the standby power source (Figure 3.2).

Figure 3.2 – Manual Transfer Switch Operation

5.To crank and start the engine, set the Auto/Off/Manual switch to MANUAL.

6.Let the engine stabilize and warm up for a few minutes.

7.Set the generator’s main circuit breaker to its ON (or closed) position. The standby power source now powers the loads.

Generac® Power Systems, Inc. 15

Image 17
Contents Installation Authorized Dealer Location IntroductionMaintenance Post Installation Start-up AdjustmentsTroubleshooting Introduction Inside Front CoverGeneral Hazards ‹ Standards Index Electrical HazardsSystem SET LED UNPACKING/INSPECTIONProtection Systems 7 kW, Single Cylinder GH-410 Engine Your Generator‹ 1.5.2 Engine Specifications‹ 1.5.1 Generator Fuel Requirements Recommendations Reconfiguring the Fuel SystemFuel Consumption 1 7 KW, 410CC EngineLocation Transfer SwitchGenerator 2.1 7 kW, 12 kW and 15 kW UnitsBattery Battery InstallationElectrical Checks Check Transfer Switch OperationBefore Initial START-UP Checking Automatic Operation Generator Tests Under Load1 7 KW Units Adjusting the Regulator Natural GAS onlyEngine Governor Adjustment 2 12 KW and 15 KW Units Voltage Regulator AdjustmentAutomatic Transfer Operation BREAK-IN Procedure‹ 3.2.3 Manual Position ‹ 3.2.1 Auto PositionManual Transfer Operation Sequence of Automatic Operation‹ 3.5.2 Transfer Back to Utility Power Source Setting the Exercise Timer‹ 3.7.1 LOW OIL Pressure Switch ‹ 3.7.2 High Temperature Switch‹ 3.7.4 Overspeed Checking the Engine OIL LevelApproximate Crank Cycle Times Changing the Engine OIL ‹ 4.3.2 OIL Change ProcedureChanging the OIL Filter ‹ 4.3.1 Engine OIL RecommendationsSpark Plugs Battery MaintenanceCooling System Adjusting GH-410/GT-990 Valve Clearance‹ 4.12.1 Removal from Service OUT of Service Procedure‹ 4.12.2 Return to Service Corrosion ProtectionSYSTEM/COMPONENT Procedure Frequency Service ScheduleProblem Cause Correction Troubleshooting GuideElectrical Data Customer Battery Utility Battery Charger Utility Connection BCR Customer Connections Neutral Exploded Views and Parts Lists Part NO.QTY. Description Exploded Views and Parts Lists QTY Description Exploded Views and Parts Lists BOX GTS Load Center Exploded Views and Parts Lists COVER, 12 Position GTS Load Center Kit Contains BUSHING, Governor Lower 138 122 KNOB, AIR Cleaner 28 31 ADAPTOR, Engine Exploded Views and Parts Lists Stator 12KW Exploded Views and Parts Lists ASSEMBLY, Connecting ROD Exploded Views and Parts Lists SCREW, Taptite M6-1.0X8 Yellow Chrome Engine only Mounting Dimensions Guardian Air-cooled 7 kW, 12 kW and 15 kW Generators Guardian Air-cooled 7 kW, 12 kW and 15 kW Generators PURCHASER’S/OWNER’S Warranty Responsibilities Your Warranty Rights and ObligationsMANUFACTURER’S Emission Control System Warranty Coverage Emission Related Parts Include the Following Emission Control System WarrantyThis Warranty Shall not Apply to the Following Warranty Schedule