Eng To install bagger components to tractor
1
1. | Discharge Chute | 2 | |
2. | 3/8 Nut | ||
| |||
3. | Flat Washer | 3 |
•Remove discharge chute from rear of tractor. Unhook the two (2) straps and pull chute out and away from tractor.
•Remove the two (2) 3/8 nuts and flat washers from the bolts at the tractor back plate.
3
2
1
1.3/8 Lock nut
2.Flat Washer
3.Support Tube
•Using the nuts and flat washers removed from tractor back plate, install the bagger support tube to the back plate as shown. Tighten securely.
|
|
| 3 |
|
1. | Support Bracket | 3 |
|
|
|
|
| ||
2. | 3/8 Carriage Bolt |
| 1 |
|
3. | 3/8 Lock Nut |
|
| |
| 5 | 4 | ||
4. | 3/8 x 63,5mm Hex Bolt |
| ||
| 2 | |||
5. | 10,3mm (13/32") | flat |
| |
|
|
washer
• Install the two upper support brackets through the back plate and to the chassis, using the 10 x 19 mm (3/8"x3/4") carriage bolts and locknuts supplied. Tighten securely.
• Assemble both support brackets to the outside of the baggger support tube using two each 3/8 x 63,5mm hex bolts13/32" I.D. flat washers and 3/8 locknuts from parts bag. Tighten securely.
2
1
1. Hook
2. Discharge Chute
3. Back plate slot
3
•Replace discharge chute into rear opening of tractor. Secure the chute with the two hook straps.
NOTE: The strap hook must go through the discharge chute only. Do not allow the hook to enter the slot in the tractor back plate. This will allow the discharge chute to float with the mower deck when moving on uneven terrain.
24