Manuals
/
Brands
/
Household Appliance
/
Boiler
/
Bosch Appliances
/
Household Appliance
/
Boiler
Bosch Appliances
24i junior, 28i junior manual
Please, tick the box below to download manual:
Contents
Main
CONTACT INFORMATION INSTALLATION & SERVICING INSTRUCTIO NS
INSTALLATION & SERVICING INSTRUCTIONS
CONTENTS
CONTENTS
SAFETY PRECAUTIONS & INSTALLATION REGULATIONS
SAFETY PRECAUTIONS INSTALLATION REGULATIONS
GENERAL INFORMATION
TECHNICAL DA TA
TECHNICAL DATA
LAYOUT & COMPONENTS
LAYOUT & COMPONENTS
LAYOUT & COMPONENTS
LAYOUT & COMPONENTS
CLEANING PR IMARY SYSTEMS
8
CLEANING PRIMARY SYSTEMS
MAINS SUPPLY
MAINS SUPPLY
WATER SYSTEMS & PIPEWORK
10
WATER SYSTEMS & PIPEWORK
CONDENSATE PIPEWORK
11
CONDENSATE PIPEWORK
PRESSURE RELIEF PIPEWORK
PRESSURE RELIEF PIPEWORK
13
BOILER LOCATION & CLEARANCES
BOILER LOCATION & CLEARANCES
SERVICING CLEARANCES VENTED COMPARTMENT
VENTILATION FREE COMPARTMENTS INSTALLATION CLEARANCES
14
BOILER LOCATION & CLEARANCES
BOILER LOCATION & CLEARANCES
PLUMBING MAN IFOLD
*
15
PLUMBING MANI FOLD
FLUE TERMI NAL POSITIONS
16
FLUE TERMINAL POS ITIONS
The flue should not penetrate the shaded area.
17
FLUE OPTIONS
FLUE OPTIONS
18
UNPACKING WALL FRAME AND ANCILLARY ITEMS
UNPACKING WALL FRAME AND ANCILLARY ITEMS
19
B
2
WALL MOUNTING TEMPLATE FLUE OPENING
A
UNPACKING THE APPLIAN CE
UNPACKING THE APPLIANC E
20
UNPACKING THE APPLIANCE
6.1 6.2
21
BOILER CONNECTIO NS
Handling Hole
22mm 15mm 22mm 15mm 22mm
1A
22
BOILER CONNECTIONS
BOILER CONNECTIONS
A E C D B
22mm 15mm 22mm 15mm 22mm
FLUE INSTALLATION
FLUE INSTALLATION
FLUE INSTALLATION
CONDENSATE CONNECTION
26
CONDENSATE CONNECTION
ELECTRICS
27
ELECTRICS
8
Page
29
PRE-COMMISSIONING CHECKS
A D C E B
30
FILLING THE SYSTEM
FILLING THE SYSTEM
STARTING THE APPLIANCE
IMPORTANT: Never run the appliance when the appliance/system is empty or partially filled.
31
CAUTION: DO NOT PRESS POWER INDICATOR (B) TO RESET BOILER.
STARTING THE APPLIANCE
WATER TREATMENT
32
WATER TREATMENT
KEY
COMMISSIONING
IMPORTANT: Do not continue commissioning until the correct gas pressure is achieved.
33
COMMISSIONING
34
FINISHING COMMISSIONING
FINISHING COMMISSIONING
Inspection
Component Access 1. Removing outer case
2. Adjusting boiler control to service position
Primary Heat Exchanger
1.1 1.2
1.3
36
1.
2.1
Setting Boiler to Maximum.
INSPECTION AND SERVI CE
To Clean the Heat Exchanger
3.3 3.2
3.1
38
Page
Page
1. Removing outer case
2. Primary sensor
3. Overheat thermostat
4. Flue overheat thermostat
1.1
1.2
41
5. Moving boiler control to service position
6. Gas valve
5.1 5.2
6.2
42
8.1
6.3
9. Access to boiler control components
10. PCB fuse
11.Transformer / PCB
12.3
12. Replacing control
44
12.1
12.2
13.1
13.2
45
13.3
14.314.214.1
18.4
16. Electrode assembly
17
46
17. Burner
19.1
21.2
47
20.1
21.1
23.2
24.1
48
25.1
26.1
27.2
28. CH pressure relief valve
49
27.1
28.2
29.2
29.1
50
30.2
30.1
31.2
31.1
51
32.3
32.1 32.2
+
C
33.2
+
CO2settings
SETTING THE GAS / AIR RATIO
SHORT PARTS LIST
123
25
24
SERVICING
1.1 1.2
2.2
54
L.P.G. CONVERSION
2.3
55
FAUL T FINDING
FAULT FINDING
Blue light indication
Lockout reset button Possible solution/check
CENTRAL HEATING FUNCTION
56
CENTRAL HEATING FUNCTION
PREHEAT AND DHW FUN CTION
IGNITION SEQUENCE
57
PREHEAT AND DHW FUNCTION
Page
CONTROLS
BOILER SERIAL No. NOTIFICATIONNo.
FOR ALL BOILERS CONFIRM THE FOLLOWING
FOR THE CENTRAL HEATING MODE, MEASURE & RECORD
GAS BOILER COMMISSIONING CHECKLIST
SERVICE INTERVAL RECORD
SERVICE 10
SERVICE 9
SERVICE 8
SERVICE 7
Check List
Greenstar 24i Junior/28i Junior Hardware/Literature Pack