BOILER CONNECTIONS
F | 5 |
|
|
|
|
| CAUTION: ISOLATE TH E MAI NS GAS |
|
|
| SUPPLY BEFORE STARTING ANY WORK |
|
|
| AND OBSERVE ALL RELEVANT SAFETY |
|
|
| PRECAUTIONS. |
|
|
| GAS AND WATER CONNECTIONS: |
|
|
| A - CH flow (22mm), B - CH return (22mm), |
|
|
| C - Gas inlet (22mm), D - Mains water inlet |
|
|
| (15mm), E - DHW outlet (15mm) |
| A | E | 5. Lower the control panel into the service |
| position by removing the screw (F) from the | ||
|
|
| |
|
| B | retaining bracket. |
|
|
| 6. Make connections to the heating system. |
|
|
| Connect the gas supply to the boiler gas |
|
|
| cock 22mm compression. |
|
|
| Connect mains water in and DHW out. |
|
|
| 7. Connect the expansion vessel flexible |
|
|
| pipe to the hydraulic manifold situated left of |
|
|
| the pump. It is necessary to remove and |
|
|
| discard the gray plastic blanking plug (G) |
|
|
| from the pressure vessel connection at the |
|
|
| hydraulic manifold before securing the |
|
|
| expansion vessel flexible pipe (H) in place |
|
|
| with the wire retaining clip ( I ) . |
|
|
| 8. Connect the pressure relief drain pipe to |
|
| H | 15mm compression joint (J) using the |
|
|
| compression nut and olive supplied in the |
|
|
| hardware literature pack. |
INSTALLATION
7
GI
J
6
C
D
H
A E C D B
22mm 15mm 22mm 15mm 22mm
I H
22
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior 8 716 107 336b (11/05)
BOILER CONNECTIONS