12 | REPLACEMENT OF PARTS | |
| ||
A | 12. Replacing control | |
| ||
| The control is supplied within its plastic | |
| housing. The complete unit must be replaced. | |
| Remove ALL electrical connections from | |
| the control PCB including where cables run | |
| through restraints. These can be unclipped | |
| from the plastic moulding noting their | |
| position. | |
| Remove the code plug (B). The code plug | |
B | should be left attached to the frame of the | |
boiler by its plastic safety thread. | ||
| ||
| 12.1 Remove the 3 screws (C) retaining the | |
12.1 | front facia making sure to support the facia | |
when removing the last screw. | ||
C | 12.2 Using a suitable tool (D), press the button | |
| (E) upwards and slide the control support | |
C | bracket (F) to the left. | |
12.3 Support the control and unclip control | ||
| ||
| support cable (G) from the boiler frame. | |
| Remove the support cable and fit to the | |
C | new control. | |
Remove appropriate cable restraints from | ||
| ||
| the new control box. | |
| Fit control to the boiler. | |
| ||
| all electrical connections to the new control. | |
| IMPORTANT: ENSURE CODE PLUG | |
| IS | |
12.2 | CONTROL. IF THIS IS NOT DONE | |
THE BOILER WLL INDICATE | ||
| ERROR AND WILL NOT FUNCTION. | |
F |
|
E
F
D
E
12.3
G
SERVICING | & SPARES |
44
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i System/24i System 8 716 107 375b (07/05)
REPLACEMENT OF PARTS