Gas Supply (alternative from above appliance) 22mm
CH Flow 22mm | DHW OUT 15mm |
DHW IN (alternative from CH Return 22mm above appliance)
15mm
INSTALLATION
PRE -
*
A
PLUMBING MANIFOLD
CONNECTIONS:
Heating System: 22mm compression fittings
DHW: | 15mm compression fittings |
Gas: | 22mm compression fittings |
Use the fittings supplied in the Lit/Hardware pack.
•If the boiler pipes are to be run behind the appliance ensure that the pipes pass through the slot in the yellow plastic guide (A). This is fitted to the boiler frame.
Further guidance on pipe routing can be found printed on the boiler template (supplied with the boiler).
Mains Gas Supply 22mm | Mains Water (DHW IN) 15mm |
|
15
PLUMBING MANIFOLD
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior 8 716 107 336b (11/05)