A - Standard Flue
B - Internal Wall Seal
C - External Wall Seal
D - Clamp
E - Extension Duct
C
A B
D
E
FLUE INSTALLATION
ASSEMBLING THE FLUE
1Slide inner collar (B) onto terminal (A)
2 Additional extensions or bends: Push fit all extensions/bends/terminal together and secure connections with clamps (D). The slope of the terminal outlet must face downwards.
FITTING THE FLUE
3Fit the terminal (A) through the flue opening in the wall, exposing the plastic outlet section to the outside and fit the outer flue collar ( C ) over the notches to secure.
4Assemble elbow to boiler using the three screws (see below).
Note: Screws are in boiler not in flue kit.
FITTING THE ELBOW:
Apply silicone grease to seal
INSTALLATION
This screw should be fitted last for easier installation
•Flue elbow should push directly down and not be twisted into correct position. Remove the 3 inner flue tube retaining screws. The inner tube will be held in place in the appliance.
Fit turret onto appliance and retain with the three removed screws.
NOTE: The clamping plate flat should be at the rear of the appliance.
ADDITIONAL NOTES AND REMINDERS:
•Ensure that all cut lengths are square and free from burrs.
•The flue, when assembled, is fully sealed and components are pushed home.
•The flue is set at an angle of 3° or 52mm per 1m length.
Flat at back
This screw should be fitted last for rear exit
25
FLUE INSTALLATION
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior 8 716 107 336b (11/05)