TABLE OF CONTENTS (continued)

 

 

5. Shipment, Handling, and Storage

 

 

5.1

Packed Machine Shipment and Handling

...........................................................................

15

5.2

Overseas Shipment Packaging (Optional)

..........................................................................

15

5.3

Handling and Transportation of Uncrated Machine

15

5.4

Machine Storage

15

6. Unpacking

 

 

6.1

Uncrating

16

6.2

Packaging Materials Disposal

16

7. Installation

 

 

7.1

Operating Conditions

17

7.2

Space Requirements for Machine Operation and Maintenance

17

7.3

Tool Kit Supplied with the Machine

17

7.4

Machine Positioning / Machine Set-Up

17

7.5

Plastic Ties Removal

18

7.6

Assembly Completion

18

7.7

Taping Heads Completion

19

7.8

Outboard Tape Roll Holder

19

7.9

Preliminary Electric Inspection

19

7.10 Main Power Machine Connection and Inspection

19

7.11 Phases Inspection

19

8. Theory of Operation

 

 

8.1

Working Cycle Description

20

8.2

Running Mode Definition

20

 

8.3.1 Normal Stop Procedure

20

 

8.3.2 Emergency Stop

20

9. Controls

 

 

9.1

Box Width Adjusting Knobs

21

9.2

Box Height Adjusting Crank

21

9.3

Start / Stop Main Switch

21

9.4

Emergency Stop Button (Latching)

21

10. Safety devices

 

 

10.1 Blade Guards

22

10.2 Emergency Stop Button

22

10.3 Electric System / Circuit Breaker

22

11. Set-Up and Adjustments

 

 

11.1 Box Width Adjustment

23

11.2 Box Height Adjustment

23

11.3 Top Flap Compression Roller Adjustment

..........................................................................

23

11.4 Changing the Tape Leg Length

23

11.5 Run Boxes to Check Adjustment

23

800a-NA

iv

2011 August

 

 

i

 

Page 9
Image 9
3M 800a manual Table of Contents Shipment, Handling, and Storage, Unpacking, Installation, Theory of Operation, Controls