7-INSTALLATION

7.1 Operating Conditions

The machine should operate in a dry and relatively clean environment (See Specifications).

7.2Space Requirements for Machine Operation and Maintenance Work

Minimum distance from wall (Figure 7-1):

A= 1000mm.

B= 700mm.

Minimum height = 2700mm.

WARNING

To reduce the risk associated with mechanical and electrical hazards:

Allow only properly trained and

qualified personnel to operate and service this equipment.

WARNING

To reduce the risk associated with muscle strain:

Use the appropriate rigging and material handling equipment when lifting or repositioning this equipment.

Use proper body mechanics when removing or installing taping heads that are moderately heavy or may be considered awkward to lift.

Figure 7-1

7.3 Tool Kit Supplied with the Machine

A tool kit containing some tools are supplied with the machine. These tools should be adequate to set-up the machine, however, other tools supplied by the customer will be required for machine maintenance.

Figure 7-2

7.4 Machine Set-Up / Bed Height

Adjust machine bed height. The case sealer is equipped with four (4) adjustable legs that are located at the corners of the machine frame. The legs can be adjusted to obtain different machine bed heights from 610mm [24 inches] minimum to 890mm [35 inches] maximum - See Specifications.

Refer to Figure 7-3and set the machine bed height as follows:

1.Raise and block up the machine frame to allow adequate leg adjustment.

2.Loosen, but do not remove, two (2) M8 x 16mm socket head screws in one leg (M6 hex wrench). Adjust the leg length for the desired machine bed height. Retighten the two (2) screws to secure the leg. Adjust all four (4) legs equally.

M8 x 16mm

Socket Head

Screws

Adjustable

Leg

Figure 7-3

800a-NA

17

2011 August

 

 

Page 29
Image 29
3M 800a manual Installation, Tool Kit Supplied with the Machine, Machine Set-Up / Bed Height