3M 9000PD manual Installing the Wall Bracket, Installation and System Setup 3M Digital WallDisplay

Models: 9000PD

1 46
Download 46 pages 63.88 Kb
Page 16
Image 16

Installation and System Setup

3M™ Digital WallDisplay

 

 

Installing the Wall Bracket

Unpacking Wall Bracket and Hardware

1. Place the shipping container face up on the floor.

2. Open the end of the shipping container.

3. Slide the shipping tray partially out the container.

4.Locate and Remove the wall bracket and hardware. The hardware is taped to the wall bracket.

Installation for a Hollow Wall-Drywall

1.Determine the desired location of the unit. Locate all wall studs in area.

2.While holding the bracket in place, use a carpenter’s level to ensure the proper level and then mark the three hole locations on the wall. Ensure that no studs are behind the hole locations.

To Floor

3.Using a Phillips screw driver, screw the supplied anchors into the wall until they are flush with the wall surface.

4.Align the wall bracket holes over the wall anchors and secure with the washer and anchor screws. Confirm that the wall bracket is level before tightening the screws.

Note: For other types of wall material (e.g. wood, concrete, concrete block) use mounting hardware that is properly rated for the weight of the unit and is intended for specific wall material.

16

© 3M 2005. All Rights Reserved.

Page 16
Image 16
3M 9000PD manual Installing the Wall Bracket, Installation and System Setup 3M Digital WallDisplay