3M 9000PD manual 3M 2005. All Rights Reserved

Models: 9000PD

1 46
Download 46 pages 63.88 Kb
Page 18
Image 18

Installation and System Setup

3M™ Digital WallDisplay

 

 

Hanging on the Wall

1.If possible, position the 3M Digital WallDisplay and shipping tray in front of the wall where the

bracket is located. Position the unit so that the projection arm is closest to the wall.

2. Clear the path from the unit to the wall where it will be hanging.

Note: Most of the weight is at the projection head/ speakers end of the 3M Digital WallDisplay.

3. With one person holding each side of the unit, carefully lift it into position so that the bracket slot is above the wall bracket. Ensure that the unit is securely in place before releasing.

4. Remove the tape from the projection arm.

18

© 3M 2005. All Rights Reserved.

Page 18
Image 18
3M 9000PD manual 3M 2005. All Rights Reserved