General Information

Pre-disassembly Instructions

Before proceeding with the disassembly procedure, make sure that you do the following:

1.Turn off the power to the system and all peripherals.

2.Unplug the AC adapter and all power and signal cables from the system.

3.Place the system on a flat, stable surface.

4.Remove the battery pack.

Disassembly Process

The disassembly process is divided into the following stages:

External module disassembly

Main unit disassembly

LCD module disassembly

The flowcharts provided in the succeeding disassembly sections illustrate the entire disassembly sequence. Observe the order of the sequence to avoid damage to any of the hardware components. For example, if you want to remove the main board, you must first remove the keyboard, then disassemble the inside assembly frame in that order.

Main Screw List

Screw

Quantity

Part Number

 

 

 

SCREW M3*0.5+3.5I

 

86.A03V7.006

 

 

 

SCREW M2.0*6-I(ANTI-LOOSE)

 

86.N1407.001

 

 

 

SCREW M2.5*2-I (NI,NYLOK)

 

86.TDY07.001

 

 

 

SCREW M2.5*4-I(BNI)

 

86.N1407.003

 

 

 

SCREW M2.0*3.0-I IRON

 

86.S0207.001

 

 

 

SCREW M2.5*4.0-I(NI)(NYLOK)

 

86.D01V7.001

 

 

 

SCREW M2.5*6.5-I(BZN(NYLOK-RED)

 

86.ARE07.001

 

 

 

SCREW M2.5*5.0-I(NI)

 

86.ARE07.004

 

 

 

SCREW M3*0.5+3.5I

 

86.TDY07.003

 

 

 

54

Chapter 3

Page 64
Image 64
Acer 8935G General Information, Pre-disassembly Instructions, Disassembly Process, Main Screw List Quantity Part Number