Acer Altos G900 Rack conversion procedures, Removing the bottom panel, Installation overview

Models: Altos G900

1 248
Download 248 pages 61.1 Kb
Page 166
Image 166

150

Appendix A: System rack installation

Rack conversion procedures

This section describes the procedures to install the contents of the rack conversion kit. Unless otherwise specified, all references to chassis directions (top, bottom, left, right, front, and rear) refer to a chassis in rack orientation when you are facing the front of the chassis.

Be sure to observe the safety and ESD precautions in the “Installation precautions” on page 41.

Installation overview

Installing the contents of the rack conversion kit involves the following steps:

Removing the bottom panel

Removing the left panel

Removing the original tower bezel

Removing the feet

Installing the rack bezel

Installing the bushings on the chassis

Installing the handles and rails (see the note below)

Note: You also need the manual from the rack-mount rail kit to complete this installation.

The following sections describe the above procedures in detail.

Removing the bottom panel

1Orient the server so it is resting on its feet as shown in Figure 60.

2Remove the two screws (Figure 60, A) located on the rear edge of the bottom panel.

3Slide the panel toward the rear of the chassis (Figure 60, B).

4Using the orientation shown in Figure 60 as a reference, grasp the bottom edge of the cover (Figure 60, C) and tilt it out. Then lift the cover straight up (Figure 60, D) to free it from the tabs on the chassis.