4. Assembly and Disassembly Procedures
Go to cover page
4.1 Assembly procedures:
Connect the cable between power board(P802)
S1 and interface board (P301)
Connect the function key cable into interface board(P303)
Connect the cable between power board(P803)and inverter board (Cn001)
Connect the FFC cable into interface board
P301
P802
Use a
S4 No.1~4 screws till that interface board and bracket chassis base firmly attached.
(No1~4 screw size=M3x6; Torque=9~10KGFxCM).
3 | 2 |
1
4
P303
CN01
P803
Take the key function cable out from the hole
S5 shown as photo
Take a bracket chassis base on a protective
S2 cushion and stick an insulator on the specific position, take a power board and turn it over. Then, put it on the specific positions of bracket chassis base.
Use a
S3 No.1~5 screws till that power board and bracket chassis base firmly attached.(No1~4 screw size=M3x6; No5 screw size=M4x8; Torque=9~10KGFxCM).
4
1
2
Fix the function key cable with a PVC tape
Turn over the bracket chassis base then fix the
S6 inverter board
Use a
(No1~4 screw size=M3x6; Torque=9~10KGFxCM).
2 | 1 |
4
3
3 | 5 |